YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    RPM: Repetitive Project Modeling

    Source: Journal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 002
    Author:
    Rehab M. Reda
    DOI: 10.1061/(ASCE)0733-9364(1990)116:2(316)
    Publisher: American Society of Civil Engineers
    Abstract: Repetitive projects are those characterized by repetitive construction activities. Examples are highway, pipeline, high‐rise building construction, etc. Many researchers recognized the disadvantages of using traditional network techniques for planning, scheduling, and monitoring such projects. Alternate approaches based on graphical or on analytical techniques have been proposed to model repetitive projects. This paper presents a new approach called the repetitive project model (RPM) that models repetitive construction projects. This model incorporates a network technique, a graphical technique, and an analytical technique in a unified approach to model repetitive projects. Comparisons between RPM and current available models are made and a numerical example is given to illustrate the use of the model.
    • Download: (723.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      RPM: Repetitive Project Modeling

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/47619
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRehab M. Reda
    date accessioned2017-05-08T21:20:26Z
    date available2017-05-08T21:20:26Z
    date copyrightJune 1990
    date issued1990
    identifier other%28asce%290733-9364%281990%29116%3A2%28316%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47619
    description abstractRepetitive projects are those characterized by repetitive construction activities. Examples are highway, pipeline, high‐rise building construction, etc. Many researchers recognized the disadvantages of using traditional network techniques for planning, scheduling, and monitoring such projects. Alternate approaches based on graphical or on analytical techniques have been proposed to model repetitive projects. This paper presents a new approach called the repetitive project model (RPM) that models repetitive construction projects. This model incorporates a network technique, a graphical technique, and an analytical technique in a unified approach to model repetitive projects. Comparisons between RPM and current available models are made and a numerical example is given to illustrate the use of the model.
    publisherAmerican Society of Civil Engineers
    titleRPM: Repetitive Project Modeling
    typeJournal Paper
    journal volume116
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1990)116:2(316)
    treeJournal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian