Surety Bonding and Owner‐Contractor Prequalification: ComparisonSource: Journal of Professional Issues in Engineering:;1990:;Volume ( 116 ):;issue: 004Author:Jeffrey S. Russell
DOI: 10.1061/(ASCE)1052-3928(1990)116:4(360)Publisher: American Society of Civil Engineers
Abstract: In the public sector, contract awards are typically made to the “lowest responsible bidder.” This term is defined by many contract‐awarding authorities as the contractor with the lowest bid who provides the bonds required by contract. Numerous professionals believe this approach is an inefficient and ineffective means to procure construction services. This paper provides a description of the competitive‐bid process along with a more complete definition of lowest responsible bidder. The definition incorporates bid responsiveness and bidder responsibility—criteria to measure both are outlined. A review of surety bonding is presented. Agencies have been dissatisfied with contractors' performance and quality of work under traditional procurement procedures. As a result, they have investigated and developed prequalification procedures. The potential role of these procedures are presented along with a comparison between surety bonding and owner contractor prequalification. A brief discussion of prequalification versus postqualification is also described.
|
Collections
Show full item record
| contributor author | Jeffrey S. Russell | |
| date accessioned | 2017-05-08T21:19:24Z | |
| date available | 2017-05-08T21:19:24Z | |
| date copyright | October 1990 | |
| date issued | 1990 | |
| identifier other | %28asce%291052-3928%281990%29116%3A4%28360%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/47034 | |
| description abstract | In the public sector, contract awards are typically made to the “lowest responsible bidder.” This term is defined by many contract‐awarding authorities as the contractor with the lowest bid who provides the bonds required by contract. Numerous professionals believe this approach is an inefficient and ineffective means to procure construction services. This paper provides a description of the competitive‐bid process along with a more complete definition of lowest responsible bidder. The definition incorporates bid responsiveness and bidder responsibility—criteria to measure both are outlined. A review of surety bonding is presented. Agencies have been dissatisfied with contractors' performance and quality of work under traditional procurement procedures. As a result, they have investigated and developed prequalification procedures. The potential role of these procedures are presented along with a comparison between surety bonding and owner contractor prequalification. A brief discussion of prequalification versus postqualification is also described. | |
| publisher | American Society of Civil Engineers | |
| title | Surety Bonding and Owner‐Contractor Prequalification: Comparison | |
| type | Journal Paper | |
| journal volume | 116 | |
| journal issue | 4 | |
| journal title | Journal of Professional Issues in Engineering | |
| identifier doi | 10.1061/(ASCE)1052-3928(1990)116:4(360) | |
| tree | Journal of Professional Issues in Engineering:;1990:;Volume ( 116 ):;issue: 004 | |
| contenttype | Fulltext |