YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Computer‐Aided Concrete‐Placement Optimization

    Source: Journal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 001
    Author:
    R. S. Phelan
    ,
    F. Radjy
    ,
    C. Haas
    ,
    C. Hendrickson
    DOI: 10.1061/(ASCE)0733-9364(1990)116:1(172)
    Publisher: American Society of Civil Engineers
    Abstract: This paper describes an enumeration method that considers both material costs and time‐delay penalties to minimize the total cost of a concrete pour subject to quality and time constraints. A wide variety of placement alternatives can be considered for each pour. The method uses the concrete‐maturity method to determine if particular concrete mix and placement combinations are feasible. The method was implemented in conjunction with a commercially available concrete strength and maturity development monitoring and simulation program. This software implementation is called the Economic Optimization Module (EOM). The EOM finds the most desirable combination of concrete mixes, concrete starting temperatures, formwork types, and curing/insulation materials for a variety of pour characteristics, weather conditions, and time requirements. Cost minimization is performed subject to quality and time constraints provided by the user. The system uses a data base of concrete mixes, concrete starting temperatures, soil types, soil temperatures, formwork types, and curing/insulation types.
    • Download: (926.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Computer‐Aided Concrete‐Placement Optimization

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/46064
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorR. S. Phelan
    contributor authorF. Radjy
    contributor authorC. Haas
    contributor authorC. Hendrickson
    date accessioned2017-05-08T21:17:53Z
    date available2017-05-08T21:17:53Z
    date copyrightMarch 1990
    date issued1990
    identifier other%28asce%290733-9364%281990%29116%3A1%28172%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/46064
    description abstractThis paper describes an enumeration method that considers both material costs and time‐delay penalties to minimize the total cost of a concrete pour subject to quality and time constraints. A wide variety of placement alternatives can be considered for each pour. The method uses the concrete‐maturity method to determine if particular concrete mix and placement combinations are feasible. The method was implemented in conjunction with a commercially available concrete strength and maturity development monitoring and simulation program. This software implementation is called the Economic Optimization Module (EOM). The EOM finds the most desirable combination of concrete mixes, concrete starting temperatures, formwork types, and curing/insulation materials for a variety of pour characteristics, weather conditions, and time requirements. Cost minimization is performed subject to quality and time constraints provided by the user. The system uses a data base of concrete mixes, concrete starting temperatures, soil types, soil temperatures, formwork types, and curing/insulation types.
    publisherAmerican Society of Civil Engineers
    titleComputer‐Aided Concrete‐Placement Optimization
    typeJournal Paper
    journal volume116
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1990)116:1(172)
    treeJournal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian