YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Contractors’ Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia

    Source: Journal of Performance of Constructed Facilities:;2006:;Volume ( 020 ):;issue: 001
    Author:
    Faisal Manzoor Arain
    ,
    Low Sui Pheng
    ,
    Sadi A. Assaf
    DOI: 10.1061/(ASCE)0887-3828(2006)20:1(74)
    Publisher: American Society of Civil Engineers
    Abstract: The study identifies the causes of inconsistencies between the design and construction of large building projects. To achieve the study objectives, a questionnaire survey was carried out to collect information on potential causes of inconsistencies at the project design and construction interface. Responses from 27 contractors were analyzed. The results suggest that the involvement of designer as consultant, communication gap between constructor and designer, insufficient working drawing details, lack of coordination between parties, lack of human resources in design firm, lack of designer’s knowledge of available materials and equipment, and incomplete plans and specifications were considered as the most important causes of the project design and construction interface inconsistencies. On the other hand, project management as a professional service, weather conditions, nationalities of participants, involvement of the contractor in design conceptual phase, unforeseen problems, involvement of the contractor in design development phase, and government regulations were the least important causes of inconsistencies between professionals at the project design and construction interface in large building projects.
    • Download: (104.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Contractors’ Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/44425
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorFaisal Manzoor Arain
    contributor authorLow Sui Pheng
    contributor authorSadi A. Assaf
    date accessioned2017-05-08T21:15:11Z
    date available2017-05-08T21:15:11Z
    date copyrightFebruary 2006
    date issued2006
    identifier other%28asce%290887-3828%282006%2920%3A1%2874%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44425
    description abstractThe study identifies the causes of inconsistencies between the design and construction of large building projects. To achieve the study objectives, a questionnaire survey was carried out to collect information on potential causes of inconsistencies at the project design and construction interface. Responses from 27 contractors were analyzed. The results suggest that the involvement of designer as consultant, communication gap between constructor and designer, insufficient working drawing details, lack of coordination between parties, lack of human resources in design firm, lack of designer’s knowledge of available materials and equipment, and incomplete plans and specifications were considered as the most important causes of the project design and construction interface inconsistencies. On the other hand, project management as a professional service, weather conditions, nationalities of participants, involvement of the contractor in design conceptual phase, unforeseen problems, involvement of the contractor in design development phase, and government regulations were the least important causes of inconsistencies between professionals at the project design and construction interface in large building projects.
    publisherAmerican Society of Civil Engineers
    titleContractors’ Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia
    typeJournal Paper
    journal volume20
    journal issue1
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)0887-3828(2006)20:1(74)
    treeJournal of Performance of Constructed Facilities:;2006:;Volume ( 020 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian