YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Common Interface Problems among Various Construction Parties

    Source: Journal of Performance of Constructed Facilities:;2000:;Volume ( 014 ):;issue: 002
    Author:
    Abdul-Mohsen Al-Hammad
    DOI: 10.1061/(ASCE)0887-3828(2000)14:2(71)
    Publisher: American Society of Civil Engineers
    Abstract: The objectives of this paper are to identify and assess the interface problems among the various construction parties. The methodology used in this research consists of two phases. In the first phase, a literature review and interviews with various construction professionals were conducted in order to identify the interface problems among them. This resulted in the identification of 19 common interface problems, which were classified into four categories: financial problems, inadequate contract and specification, environmental problems, and other common problems. In the second phase, a questionnaire was developed that included the identified interface problems obtained from the first phase. This survey was then randomly distributed to selected samples of 102 various construction professions consisting of owners, designers, general contractors, subcontractors, and maintenance contractors from Saudi Arabia to evaluate the severity of the 19 identified interface problems. The relative severity of the categories and their related problems were determined and then ranked according to a severity index. Three categories were found to have a “severe” effect, while the remaining category was rated “moderately severe.” Fourteen of the detailed common problems were evaluated as “severe,” while the remaining five were evaluated as “moderately severe.” Furthermore, this study presents additional common problems obtained from the survey.
    • Download: (39.61Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Common Interface Problems among Various Construction Parties

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/44213
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorAbdul-Mohsen Al-Hammad
    date accessioned2017-05-08T21:14:54Z
    date available2017-05-08T21:14:54Z
    date copyrightMay 2000
    date issued2000
    identifier other%28asce%290887-3828%282000%2914%3A2%2871%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44213
    description abstractThe objectives of this paper are to identify and assess the interface problems among the various construction parties. The methodology used in this research consists of two phases. In the first phase, a literature review and interviews with various construction professionals were conducted in order to identify the interface problems among them. This resulted in the identification of 19 common interface problems, which were classified into four categories: financial problems, inadequate contract and specification, environmental problems, and other common problems. In the second phase, a questionnaire was developed that included the identified interface problems obtained from the first phase. This survey was then randomly distributed to selected samples of 102 various construction professions consisting of owners, designers, general contractors, subcontractors, and maintenance contractors from Saudi Arabia to evaluate the severity of the 19 identified interface problems. The relative severity of the categories and their related problems were determined and then ranked according to a severity index. Three categories were found to have a “severe” effect, while the remaining category was rated “moderately severe.” Fourteen of the detailed common problems were evaluated as “severe,” while the remaining five were evaluated as “moderately severe.” Furthermore, this study presents additional common problems obtained from the survey.
    publisherAmerican Society of Civil Engineers
    titleCommon Interface Problems among Various Construction Parties
    typeJournal Paper
    journal volume14
    journal issue2
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)0887-3828(2000)14:2(71)
    treeJournal of Performance of Constructed Facilities:;2000:;Volume ( 014 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian