YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Time‐Cost Trade‐Off Among Related Activities

    Source: Journal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 003
    Author:
    Rehab Reda
    ,
    Robert I. Carr
    DOI: 10.1061/(ASCE)0733-9364(1989)115:3(475)
    Publisher: American Society of Civil Engineers
    Abstract: This paper describes the typical pragmatic approach that construction planners taken in performing time‐cost trade‐off (TCT). In general, projects have major dominant characteristics, operations, or resources whose planning affects or dominates planning of other operations and resources. Planning focuses first on the dominant characteristics and is then fine‐tuned in its details. Planners typically cycle between plan generation and cost estimating at ever finer levels of detail until they settle on a plan that has an acceptable cost and duration. Computerized TCT methods do not follow this cycle. Instead, they separate the plan into activities, each of which is assumed to have a single time‐cost curve in which all points are compatible and independent of all points in other activities' curves and that contains all direct cost differences among its methods. In general, these assumptions are not true for construction. Construction activities are related because they share methods and resources. Crashing activities usually require changes from normal, least‐cost methods and resources. Changes in one activity are not independent of changes in related activities. Therefore, normal computerized TCT techniques are conceptually wrong for construction and they are not useful in practice.
    • Download: (670.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Time‐Cost Trade‐Off Among Related Activities

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/43620
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRehab Reda
    contributor authorRobert I. Carr
    date accessioned2017-05-08T21:13:53Z
    date available2017-05-08T21:13:53Z
    date copyrightSeptember 1989
    date issued1989
    identifier other%28asce%290733-9364%281989%29115%3A3%28475%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/43620
    description abstractThis paper describes the typical pragmatic approach that construction planners taken in performing time‐cost trade‐off (TCT). In general, projects have major dominant characteristics, operations, or resources whose planning affects or dominates planning of other operations and resources. Planning focuses first on the dominant characteristics and is then fine‐tuned in its details. Planners typically cycle between plan generation and cost estimating at ever finer levels of detail until they settle on a plan that has an acceptable cost and duration. Computerized TCT methods do not follow this cycle. Instead, they separate the plan into activities, each of which is assumed to have a single time‐cost curve in which all points are compatible and independent of all points in other activities' curves and that contains all direct cost differences among its methods. In general, these assumptions are not true for construction. Construction activities are related because they share methods and resources. Crashing activities usually require changes from normal, least‐cost methods and resources. Changes in one activity are not independent of changes in related activities. Therefore, normal computerized TCT techniques are conceptually wrong for construction and they are not useful in practice.
    publisherAmerican Society of Civil Engineers
    titleTime‐Cost Trade‐Off Among Related Activities
    typeJournal Paper
    journal volume115
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1989)115:3(475)
    treeJournal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian