YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Work Section Planning for Accompanying Construction of Extra-Long Tunnel and Ballastless Track of Mountainous High-Speed Railways

    Source: Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 009::page 04025126-1
    Author:
    Yang, Shusheng
    ,
    Zhang, Jingjian
    ,
    Xu, Shuangting
    ,
    Deng, Ting
    ,
    He, Qing
    ,
    Wang, Ping
    DOI: 10.1061/JCEMD4.COENG-16397
    Publisher: American Society of Civil Engineers
    Abstract: AbstractReasonable construction methods and construction work section planning (WSP) are the key influencing factors in ensuring that the construction of extra-long railway tunnels is completed in time. This study proposes a new construction planning ...
    • Download: (2.692Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Work Section Planning for Accompanying Construction of Extra-Long Tunnel and Ballastless Track of Mountainous High-Speed Railways

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4314690
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYang, Shusheng
    contributor authorZhang, Jingjian
    contributor authorXu, Shuangting
    contributor authorDeng, Ting
    contributor authorHe, Qing
    contributor authorWang, Ping
    date accessioned2026-08-20T21:35:07Z
    date available2026-08-20T21:35:07Z
    date copyright2025/06/27
    date issued2025
    identifier otherJCEMD4.COENG-16397.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4314690
    description abstractAbstractReasonable construction methods and construction work section planning (WSP) are the key influencing factors in ensuring that the construction of extra-long railway tunnels is completed in time. This study proposes a new construction planning ...
    publisherAmerican Society of Civil Engineers
    titleWork Section Planning for Accompanying Construction of Extra-Long Tunnel and Ballastless Track of Mountainous High-Speed Railways
    typeJournal Article
    journal volume151
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-16397
    journal fristpage04025126-1
    journal lastpage04025126-16
    page16
    treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian