YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    The Practice of Demolishing a Truss-Combined Arch Bridge

    Source: Journal of Performance of Constructed Facilities:;2025:;Volume ( 039 ):;issue: 006::page 04025053-1
    Author:
    Zhou, Shuixing
    ,
    Yang, Jian
    ,
    Liu, Bin
    ,
    Sun, Ceshi
    DOI: 10.1061/JPCFEV.CFENG-5163
    Publisher: American Society of Civil Engineers
    Abstract: AbstractThe demolition of the severely deteriorated 150-m main span Huayudong truss-combined arch bridge in China presented significant challenges. Because of its location over a primary water source, a nonexplosive approach was needed. This paper details ...
    • Download: (1.438Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      The Practice of Demolishing a Truss-Combined Arch Bridge

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4312938
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorZhou, Shuixing
    contributor authorYang, Jian
    contributor authorLiu, Bin
    contributor authorSun, Ceshi
    date accessioned2026-08-20T11:59:15Z
    date available2026-08-20T11:59:15Z
    date copyright2025/08/22
    date issued2025
    identifier otherJPCFEV.CFENG-5163.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4312938
    description abstractAbstractThe demolition of the severely deteriorated 150-m main span Huayudong truss-combined arch bridge in China presented significant challenges. Because of its location over a primary water source, a nonexplosive approach was needed. This paper details ...
    publisherAmerican Society of Civil Engineers
    titleThe Practice of Demolishing a Truss-Combined Arch Bridge
    typeJournal Article
    journal volume39
    journal issue6
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/JPCFEV.CFENG-5163
    journal fristpage04025053-1
    journal lastpage04025053-10
    page10
    treeJournal of Performance of Constructed Facilities:;2025:;Volume ( 039 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian