Show simple item record

contributor authorXue, Yutong
contributor authorLe, Yun
contributor authorJia, Fuyuan
contributor authorPeng, Tong
date accessioned2026-08-20T11:49:28Z
date available2026-08-20T11:49:28Z
date copyright2025/06/05
date issued2025
identifier otherJMENEA.MEENG-6726.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4312720
description abstractAbstractThe timely and high-quality transition to operations for large infrastructure projects (LIPs) requires an integrated schedule of construction and operational readiness, which is inherently vulnerable to multiple risks. These risks cause delays in ...
publisherAmerican Society of Civil Engineers
titleDelays in Large Infrastructure Projects Transitioning to Operations: Analysis Based on a Schedule–Risk Network Coupling Model
typeJournal Article
journal volume41
journal issue5
journal titleJournal of Management in Engineering
identifier doi10.1061/JMENEA.MEENG-6726
journal fristpage04025035-1
journal lastpage04025035-21
page21
treeJournal of Management in Engineering:;2025:;Volume ( 041 ):;issue: 005
contenttypeFulltext