YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Integration of a Natural Language Processing and Project Scheduling Tool for Contractual Delay Risk Identification in a Highway Construction Project Using LLMs

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 003::page 04526026-1
    Author:
    Manda, Gaureeshwar
    ,
    Vilventhan, Aneetha
    DOI: 10.1061/JLADAH.LADR-1500
    Publisher: American Society of Civil Engineers
    Abstract: AbstractConstruction contracts contain essential information regarding delay clauses. These clauses are associated with improper execution of work in accordance with contractual requirements. Contract documents require thorough review. Additionally, the ...
    • Download: (2.167Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Integration of a Natural Language Processing and Project Scheduling Tool for Contractual Delay Risk Identification in a Highway Construction Project Using LLMs

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311933
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorManda, Gaureeshwar
    contributor authorVilventhan, Aneetha
    date accessioned2026-08-20T11:15:43Z
    date available2026-08-20T11:15:43Z
    date copyright2026/03/28
    date issued2026
    identifier otherJLADAH.LADR-1500.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311933
    description abstractAbstractConstruction contracts contain essential information regarding delay clauses. These clauses are associated with improper execution of work in accordance with contractual requirements. Contract documents require thorough review. Additionally, the ...
    publisherAmerican Society of Civil Engineers
    titleIntegration of a Natural Language Processing and Project Scheduling Tool for Contractual Delay Risk Identification in a Highway Construction Project Using LLMs
    typeJournal Article
    journal volume18
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-1500
    journal fristpage04526026-1
    journal lastpage04526026-17
    page17
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian