YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Price Adjustment Clauses in Highway Construction: State of the Practice

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 002::page 04525119-1
    Author:
    Naghdi, Mohsen
    ,
    Erfani, Abdolmajid
    ,
    Geary, Georgene
    ,
    Ashuri, Baabak
    DOI: 10.1061/JLADAH.LADR-1485
    Publisher: American Society of Civil Engineers
    Abstract: AbstractMaterial price volatility creates uncertainty for highway construction projects. This uncertainty complicates bid preparation because suppliers may be unable to guarantee fixed material prices for the project duration. In response, contractors ...
    • Download: (1.652Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Price Adjustment Clauses in Highway Construction: State of the Practice

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311931
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorNaghdi, Mohsen
    contributor authorErfani, Abdolmajid
    contributor authorGeary, Georgene
    contributor authorAshuri, Baabak
    date accessioned2026-08-20T11:15:39Z
    date available2026-08-20T11:15:39Z
    date copyright2025/12/31
    date issued2026
    identifier otherJLADAH.LADR-1485.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311931
    description abstractAbstractMaterial price volatility creates uncertainty for highway construction projects. This uncertainty complicates bid preparation because suppliers may be unable to guarantee fixed material prices for the project duration. In response, contractors ...
    publisherAmerican Society of Civil Engineers
    titlePrice Adjustment Clauses in Highway Construction: State of the Practice
    typeJournal Article
    journal volume18
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-1485
    journal fristpage04525119-1
    journal lastpage04525119-15
    page15
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian