YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Effectiveness of Dispute Resolution Processes in State Departments of Transportation Projects: A Case Study Approach

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 002::page 04525103-1
    Author:
    Ankir, Husam M. Mohd
    ,
    Nacir, Chaimae
    ,
    Kumar, Shantanu
    ,
    Gad, Ghada M.
    ,
    Mehany, Mohammed S. Hashem M.
    ,
    Dettman, Kurt L.
    DOI: 10.1061/JLADAH.LADR-1277
    Publisher: American Society of Civil Engineers
    Abstract: AbstractAround 10% to 30% of construction projects encounter significant challenges, with over 25% resulting in official claims. When parties are unable to reach a resolution, they resort to the dispute resolution process (DRP) depicted in their contracts,...
    • Download: (338.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Effectiveness of Dispute Resolution Processes in State Departments of Transportation Projects: A Case Study Approach

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311865
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorAnkir, Husam M. Mohd
    contributor authorNacir, Chaimae
    contributor authorKumar, Shantanu
    contributor authorGad, Ghada M.
    contributor authorMehany, Mohammed S. Hashem M.
    contributor authorDettman, Kurt L.
    date accessioned2026-08-20T11:13:13Z
    date available2026-08-20T11:13:13Z
    date copyright2025/12/17
    date issued2026
    identifier otherJLADAH.LADR-1277.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311865
    description abstractAbstractAround 10% to 30% of construction projects encounter significant challenges, with over 25% resulting in official claims. When parties are unable to reach a resolution, they resort to the dispute resolution process (DRP) depicted in their contracts,...
    publisherAmerican Society of Civil Engineers
    titleEffectiveness of Dispute Resolution Processes in State Departments of Transportation Projects: A Case Study Approach
    typeJournal Article
    journal volume18
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-1277
    journal fristpage04525103-1
    journal lastpage04525103-12
    page12
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian