YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimizing Multicomponent Intervention Programs Considering Costs, Interdependencies, Possession Windows, and Service Loss Risks

    Source: Journal of Infrastructure Systems:;2025:;Volume ( 031 ):;issue: 003::page 04025018-1
    Author:
    Mehranfar, Hamed
    ,
    Adey, Bryan T.
    ,
    Moghtadernejad, Saviz
    ,
    Fecarotti, Claudia
    DOI: 10.1061/JITSE4.ISENG-2615
    Publisher: American Society of Civil Engineers
    Abstract: AbstractPresently, upon identifying the necessary railway interventions for a given timeframe in the future, e.g., five years, railway managers frequently undertake an iterative process to sequence the required interventions. These iterations often happen ...Practical ApplicationsThe methodology presented in this paper enables infrastructure managers, such as network and production planners, involved in the later phases of the intervention planning process, to leverage digitalization for generating a ...
    • Download: (2.695Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Optimizing Multicomponent Intervention Programs Considering Costs, Interdependencies, Possession Windows, and Service Loss Risks

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311802
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorMehranfar, Hamed
    contributor authorAdey, Bryan T.
    contributor authorMoghtadernejad, Saviz
    contributor authorFecarotti, Claudia
    date accessioned2026-08-20T11:10:47Z
    date available2026-08-20T11:10:47Z
    date copyright2025/06/05
    date issued2025
    identifier otherJITSE4.ISENG-2615.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311802
    description abstractAbstractPresently, upon identifying the necessary railway interventions for a given timeframe in the future, e.g., five years, railway managers frequently undertake an iterative process to sequence the required interventions. These iterations often happen ...Practical ApplicationsThe methodology presented in this paper enables infrastructure managers, such as network and production planners, involved in the later phases of the intervention planning process, to leverage digitalization for generating a ...
    publisherAmerican Society of Civil Engineers
    titleOptimizing Multicomponent Intervention Programs Considering Costs, Interdependencies, Possession Windows, and Service Loss Risks
    typeJournal Article
    journal volume31
    journal issue3
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/JITSE4.ISENG-2615
    journal fristpage04025018-1
    journal lastpage04025018-24
    page24
    treeJournal of Infrastructure Systems:;2025:;Volume ( 031 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian