| contributor author | Tang, Qinghui | |
| contributor author | Wu, Mingyue | |
| contributor author | Yu, Shui | |
| date accessioned | 2026-08-20T11:02:06Z | |
| date available | 2026-08-20T11:02:06Z | |
| date copyright | 2025/07/28 | |
| date issued | 2025 | |
| identifier other | AJRUA6.RUENG-1557.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311603 | |
| description abstract | AbstractRisk analysis of engineering, procurement, and construction (EPC) projects involving
prefabricated green rural housing is an important prerequisite for project risk management
and sustainable development of rural housing. Through the analysis of ...Practical ApplicationsThis study provides a practical risk management method for prefabricated green rural
housing projects under the EPC model, focusing on the following key issues. (1) Risk
identification and control points. Decision phase: Deviation in ... | |
| publisher | American Society of Civil Engineers | |
| title | Risk Analysis of an EPC Project Involving Prefabricated Green Rural Housing from the Stakeholder Perspective: Case Study in Changfeng County, Anhui Province, China | |
| type | Journal Article | |
| journal volume | 11 | |
| journal issue | 4 | |
| journal title | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering | |
| identifier doi | 10.1061/AJRUA6.RUENG-1557 | |
| journal fristpage | 04025059-1 | |
| journal lastpage | 04025059-11 | |
| page | 11 | |
| tree | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2025:;Volume ( 011 ):;issue: 004 | |
| contenttype | Fulltext | |