YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Integrated Time–Cost–Safety Trade-off Analysis and Visual Safety Heat Maps for Enhanced Construction Performance

    Source: Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 008::page 04026114-1
    Author:
    Shams, Alia
    ,
    Marzouk, Mohamed
    DOI: 10.1061/JCEMD4.COENG-18003
    Publisher: American Society of Civil Engineers
    Abstract: AbstractConstruction sites remain among the most hazardous work environments, with safety risks threatening workers and project performance. While safety-leading indicators are widely recognized in accident prevention, there remains a gap in integrating ...
    • Download: (2.449Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Integrated Time–Cost–Safety Trade-off Analysis and Visual Safety Heat Maps for Enhanced Construction Performance

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311203
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorShams, Alia
    contributor authorMarzouk, Mohamed
    date accessioned2026-08-20T10:44:39Z
    date available2026-08-20T10:44:39Z
    date copyright2026/05/27
    date issued2026
    identifier otherJCEMD4.COENG-18003.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311203
    description abstractAbstractConstruction sites remain among the most hazardous work environments, with safety risks threatening workers and project performance. While safety-leading indicators are widely recognized in accident prevention, there remains a gap in integrating ...
    publisherAmerican Society of Civil Engineers
    titleIntegrated Time–Cost–Safety Trade-off Analysis and Visual Safety Heat Maps for Enhanced Construction Performance
    typeJournal Article
    journal volume152
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-18003
    journal fristpage04026114-1
    journal lastpage04026114-16
    page16
    treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian