| contributor author | Liu, Yuming | |
| contributor author | Junjia, Yin | |
| contributor author | Wang, Hao | |
| contributor author | Alias, Aidi Hizami | |
| date accessioned | 2026-08-20T10:42:03Z | |
| date available | 2026-08-20T10:42:03Z | |
| date copyright | 2026/01/31 | |
| date issued | 2026 | |
| identifier other | JCEMD4.COENG-17344.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311141 | |
| description abstract | AbstractUnlocking operational efficiency gains from construction robotics (CR) in commercial
residential projects (CRPs) hinges critically on agile management rather than technology
deployment alone. We propose the Construction Robotics Agile Success ...Practical ApplicationsThis study introduces a hybrid method that combines subproject-level work efficiency
gains from construction robotics implementation with agile management practices to
enhance the operational efficiency of robotics adoption in large-...The Graphical Abstract illustrates a bridge structure symbolizing the integration
of construction robotics and agile management. The upper part of the bridge represents
the implementation of construction robotics and the adoption of agile management ... | |
| publisher | American Society of Civil Engineers | |
| title | Bridging Robotics Implementation and Operational Efficiency via Agile Management: Evidence from Commercial Residential Projects | |
| type | Journal Article | |
| journal volume | 152 | |
| journal issue | 4 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/JCEMD4.COENG-17344 | |
| journal fristpage | 04026019-1 | |
| journal lastpage | 04026019-17 | |
| page | 17 | |
| tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 004 | |
| contenttype | Fulltext | |