YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Automated Project Rescheduling with Preemptive Activity Splitting for Baseline Restoration

    Source: Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 006::page 04026065-1
    Author:
    Safikhani, Sara
    ,
    Shafaat, Ali
    ,
    Sartipipour, Mohsen
    DOI: 10.1061/JCEMD4.COENG-17332
    Publisher: American Society of Civil Engineers
    Abstract: AbstractThis paper introduces an automated project scheduling framework tailored to the complexities of construction environments, with a particular emphasis on preemptive activity splitting. The proposed method builds on the preemptive multi-mode ...
    • Download: (7.696Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Automated Project Rescheduling with Preemptive Activity Splitting for Baseline Restoration

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311140
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSafikhani, Sara
    contributor authorShafaat, Ali
    contributor authorSartipipour, Mohsen
    date accessioned2026-08-20T10:41:59Z
    date available2026-08-20T10:41:59Z
    date copyright2026/04/06
    date issued2026
    identifier otherJCEMD4.COENG-17332.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311140
    description abstractAbstractThis paper introduces an automated project scheduling framework tailored to the complexities of construction environments, with a particular emphasis on preemptive activity splitting. The proposed method builds on the preemptive multi-mode ...
    publisherAmerican Society of Civil Engineers
    titleAutomated Project Rescheduling with Preemptive Activity Splitting for Baseline Restoration
    typeJournal Article
    journal volume152
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-17332
    journal fristpage04026065-1
    journal lastpage04026065-15
    page15
    treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian