| contributor author | Jaiswal, Sarang | |
| contributor author | Kar, Santu | |
| date accessioned | 2026-08-20T10:38:56Z | |
| date available | 2026-08-20T10:38:56Z | |
| date copyright | 2025/10/01 | |
| date issued | 2025 | |
| identifier other | JCEMD4.COENG-16841.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311072 | |
| description abstract | AbstractThe construction industry has been criticized for poor team coordination, a crucial
factor in effective project delivery. Integrating design data, construction schedules,
and labor acquisition can enhance coordination among design, planning, and ...Practical ApplicationsThis study contributes to construction labor management by developing a DSS that integrates
Revit and Primavera P6, enabling seamless coordination among design, scheduling, and
workforce planning. Unlike existing methods, the DSS ... | |
| publisher | American Society of Civil Engineers | |
| title | A Decision Support System for Optimizing Labor Acquisition in Construction | |
| type | Journal Article | |
| journal volume | 151 | |
| journal issue | 12 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/JCEMD4.COENG-16841 | |
| journal fristpage | 04025211-1 | |
| journal lastpage | 04025211-21 | |
| page | 21 | |
| tree | Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012 | |
| contenttype | Fulltext | |