YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    A Process-Improvement Method for Implementing Earned Value–Based Project Management in Organizations

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 012::page 04024170-1
    Author:
    Quentin Panquet
    ,
    Mario Bourgault
    ,
    Robert Pellerin
    ,
    Christophe Danjou
    ,
    Nathalie Perrier
    DOI: 10.1061/JCEMD4.COENG-15041
    Publisher: American Society of Civil Engineers
    Abstract: Project monitoring has become crucial to the success of organizations in an increasingly competitive industrial environment. As such, earned value management (EVM) is an essential part of project cost control. Over the years, the scientific literature has mainly focused on developing mathematical models to improve EVM, whereas very few researchers have examined the implementation of EVM in organizations. Although some standards provide general guidelines for implementing the methodology, they rarely consider the maturity of the organization or the strategy required to implement it. This paper aims to develop an EVM implementation plan method for organizations. The method identifies the activities to be carried out, their sequencing, and the corresponding roles, techniques, and deliverables associated with each activity. The analysis of this phase of the existing situation allows for a consideration of the organization’s maturity level based on a process mapping analysis and its audit of the organization. Relevant recommendations are then identified before defining EVM implementation strategies according to the organization’s needs, constraints, and resources. Interviews with professionals allowed for the verification of the relevance of the recommendations before assigning them to the defined implementation strategies at every stage of implementation. The impact of each strategy on the organization’s processes is mapped and analyzed to determine the expected costs and benefits. The implementation method was tested successfully within a firm.
    • Download: (2.322Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      A Process-Improvement Method for Implementing Earned Value–Based Project Management in Organizations

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4304354
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorQuentin Panquet
    contributor authorMario Bourgault
    contributor authorRobert Pellerin
    contributor authorChristophe Danjou
    contributor authorNathalie Perrier
    date accessioned2025-04-20T10:16:06Z
    date available2025-04-20T10:16:06Z
    date copyright9/23/2024 12:00:00 AM
    date issued2024
    identifier otherJCEMD4.COENG-15041.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4304354
    description abstractProject monitoring has become crucial to the success of organizations in an increasingly competitive industrial environment. As such, earned value management (EVM) is an essential part of project cost control. Over the years, the scientific literature has mainly focused on developing mathematical models to improve EVM, whereas very few researchers have examined the implementation of EVM in organizations. Although some standards provide general guidelines for implementing the methodology, they rarely consider the maturity of the organization or the strategy required to implement it. This paper aims to develop an EVM implementation plan method for organizations. The method identifies the activities to be carried out, their sequencing, and the corresponding roles, techniques, and deliverables associated with each activity. The analysis of this phase of the existing situation allows for a consideration of the organization’s maturity level based on a process mapping analysis and its audit of the organization. Relevant recommendations are then identified before defining EVM implementation strategies according to the organization’s needs, constraints, and resources. Interviews with professionals allowed for the verification of the relevance of the recommendations before assigning them to the defined implementation strategies at every stage of implementation. The impact of each strategy on the organization’s processes is mapped and analyzed to determine the expected costs and benefits. The implementation method was tested successfully within a firm.
    publisherAmerican Society of Civil Engineers
    titleA Process-Improvement Method for Implementing Earned Value–Based Project Management in Organizations
    typeJournal Article
    journal volume150
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-15041
    journal fristpage04024170-1
    journal lastpage04024170-17
    page17
    treeJournal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian