YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Hydraulic Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Hydraulic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Discharge through Open Offset Joints and Cracks in Spillway Chutes

    Source: Journal of Hydraulic Engineering:;2024:;Volume ( 150 ):;issue: 005::page 04024032-1
    Author:
    Tony L. Wahl
    ,
    Bryan J. Heiner
    DOI: 10.1061/JHEND8.HYENG-13898
    Publisher: American Society of Civil Engineers
    Abstract: Spillway chutes containing offsets into the flow at joints or cracks are susceptible to hydraulic jacking from injected high pressures and erosion of foundation materials caused by flow through the openings. Consequently, drainage systems are often provided below the chute floor, but there is a lack of reliable experimental data on expected flow rates. To address this need, uplift pressure and joint discharge tests were performed in a supercritical flume equipped with a model joint whose gap width and offset height into the flow were adjusted over a 725∶1 range of aspect ratios. A previous article gives relations for computing the uplift pressure generated in undrained foundation conditions. This article provides relations for computing discharge through a joint or crack acting as an orifice when the foundation is partially or fully drained. When drainage is unable to fully vent the foundation, these relations can also be used to estimate the residual pressure obtained from partial drainage. Application to the 2017 spillway failure at Oroville Dam shows that open joints can admit much larger flows than previously estimated. This emphasizes the importance of preventive measures such as joint details that prevent the development of offsets into the flow, maintenance to remediate existing offsets, and waterstops to prevent water intrusion. Aging spillway chutes often exhibit cracks or displaced joints that create offsets into the flow. Water entering these areas can cause erosion of the foundation leading to failures such as the one experienced at Guajataca Dam in Puerto Rico in 2017. Drainage systems beneath a slab are one method for addressing such problems. Testing performed in a high-velocity laboratory flume was used to develop equations for calculating the flow rate into open offsets. The equations can also be used to estimate the residual pressure remaining in the foundation as a result of partial drainage. An example application to the 2017 spillway failure at Oroville Dam shows that open joints can admit much more flow than previously estimated. The most effective methods for preventing such failures in the future are the design of joints with details that prevent the development of offsets into the flow, grinding down displaced joints or cracks in existing spillways to eliminate offsets into the flow, and the use of waterstops in original construction to prevent water intrusion.
    • Download: (1.115Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Discharge through Open Offset Joints and Cracks in Spillway Chutes

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4299014
    Collections
    • Journal of Hydraulic Engineering

    Show full item record

    contributor authorTony L. Wahl
    contributor authorBryan J. Heiner
    date accessioned2024-12-24T10:29:22Z
    date available2024-12-24T10:29:22Z
    date copyright9/1/2024 12:00:00 AM
    date issued2024
    identifier otherJHEND8.HYENG-13898.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4299014
    description abstractSpillway chutes containing offsets into the flow at joints or cracks are susceptible to hydraulic jacking from injected high pressures and erosion of foundation materials caused by flow through the openings. Consequently, drainage systems are often provided below the chute floor, but there is a lack of reliable experimental data on expected flow rates. To address this need, uplift pressure and joint discharge tests were performed in a supercritical flume equipped with a model joint whose gap width and offset height into the flow were adjusted over a 725∶1 range of aspect ratios. A previous article gives relations for computing the uplift pressure generated in undrained foundation conditions. This article provides relations for computing discharge through a joint or crack acting as an orifice when the foundation is partially or fully drained. When drainage is unable to fully vent the foundation, these relations can also be used to estimate the residual pressure obtained from partial drainage. Application to the 2017 spillway failure at Oroville Dam shows that open joints can admit much larger flows than previously estimated. This emphasizes the importance of preventive measures such as joint details that prevent the development of offsets into the flow, maintenance to remediate existing offsets, and waterstops to prevent water intrusion. Aging spillway chutes often exhibit cracks or displaced joints that create offsets into the flow. Water entering these areas can cause erosion of the foundation leading to failures such as the one experienced at Guajataca Dam in Puerto Rico in 2017. Drainage systems beneath a slab are one method for addressing such problems. Testing performed in a high-velocity laboratory flume was used to develop equations for calculating the flow rate into open offsets. The equations can also be used to estimate the residual pressure remaining in the foundation as a result of partial drainage. An example application to the 2017 spillway failure at Oroville Dam shows that open joints can admit much more flow than previously estimated. The most effective methods for preventing such failures in the future are the design of joints with details that prevent the development of offsets into the flow, grinding down displaced joints or cracks in existing spillways to eliminate offsets into the flow, and the use of waterstops in original construction to prevent water intrusion.
    publisherAmerican Society of Civil Engineers
    titleDischarge through Open Offset Joints and Cracks in Spillway Chutes
    typeJournal Article
    journal volume150
    journal issue5
    journal titleJournal of Hydraulic Engineering
    identifier doi10.1061/JHEND8.HYENG-13898
    journal fristpage04024032-1
    journal lastpage04024032-10
    page10
    treeJournal of Hydraulic Engineering:;2024:;Volume ( 150 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian