YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Measuring Activity-Level Construction Productivity

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 008::page 04024099-1
    Author:
    Asitha Rathnayake
    ,
    Danny Murguia
    ,
    Campbell Middleton
    DOI: 10.1061/JCEMD4.COENG-14602
    Publisher: American Society of Civil Engineers
    Abstract: Activity-level productivity measurement often overlooks losses due to poor construction flows—that is, the flows of workers, materials, and equipment. Using data from 138 locations and 33 crews, correlation and regression analyses were conducted on several flow metrics. The results showed that excess work-in-progress time, representing handoffs among crews, and work discontinuities, representing stoppages between locations, had the most significant association with productivity. These findings led to the development of a novel framework for measuring activity-level construction productivity. In this framework, productivity is decomposed into efficiency (measured through work sampling) and effectiveness (measured as increased output). We applied our framework to a building construction project featuring four structural work crews operating across multiple levels. The results indicate that productivity losses due to crew handoffs and work discontinuities decrease as work becomes more repetitive. Additionally, inefficiencies or idling occur when moving equipment is unavailable, whereas ineffectiveness occurs with high rework. Our framework enables the identification of various sources of productivity loss. It also helps understand that the direct work rate is just one component of overall productivity.
    • Download: (2.094Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Measuring Activity-Level Construction Productivity

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4298797
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAsitha Rathnayake
    contributor authorDanny Murguia
    contributor authorCampbell Middleton
    date accessioned2024-12-24T10:22:25Z
    date available2024-12-24T10:22:25Z
    date copyright8/1/2024 12:00:00 AM
    date issued2024
    identifier otherJCEMD4.COENG-14602.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4298797
    description abstractActivity-level productivity measurement often overlooks losses due to poor construction flows—that is, the flows of workers, materials, and equipment. Using data from 138 locations and 33 crews, correlation and regression analyses were conducted on several flow metrics. The results showed that excess work-in-progress time, representing handoffs among crews, and work discontinuities, representing stoppages between locations, had the most significant association with productivity. These findings led to the development of a novel framework for measuring activity-level construction productivity. In this framework, productivity is decomposed into efficiency (measured through work sampling) and effectiveness (measured as increased output). We applied our framework to a building construction project featuring four structural work crews operating across multiple levels. The results indicate that productivity losses due to crew handoffs and work discontinuities decrease as work becomes more repetitive. Additionally, inefficiencies or idling occur when moving equipment is unavailable, whereas ineffectiveness occurs with high rework. Our framework enables the identification of various sources of productivity loss. It also helps understand that the direct work rate is just one component of overall productivity.
    publisherAmerican Society of Civil Engineers
    titleMeasuring Activity-Level Construction Productivity
    typeJournal Article
    journal volume150
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-14602
    journal fristpage04024099-1
    journal lastpage04024099-16
    page16
    treeJournal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian