YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Automated Approach to Negotiation of BOT Contracts

    Source: Journal of Computing in Civil Engineering:;1997:;Volume ( 011 ):;issue: 002
    Author:
    Loh Ngee
    ,
    Robert L. K. Tiong
    ,
    Jahidul Alum
    DOI: 10.1061/(ASCE)0887-3801(1997)11:2(121)
    Publisher: American Society of Civil Engineers
    Abstract: Build, operate and transfer (BOT) projects have become of increasing interest over the last few years. The BOT model entails a concession company providing the finance, design, construction, operation, and maintenance of an infrastructure project for a specified concession period. This paper deals with the negotiation of financial and contractual parameters associated with a BOT project before it is awarded to the promoter. It describes the development of an automated mechanism as an alternative approach in expediting the negotiation over a suitable pricing structure for the BOT project. The mechanism was developed by incorporating spreadsheet data into multiple linear regression models to formulate the prediction equations using the tariff, concession period, and rate of return as the variables. This approach reduces the bulk of urgent recomputations of the project cash flows during the final negotiation that would otherwise entail the use of considerable resources. The mechanisms could therefore be used as enhanced tools for dynamic negotiation between the government and the promoter for an acceptable level of tariff structure; concession period and rate of return on the promoter's investments; and for balancing the risk/return profiles of both parties.
    • Download: (1009.Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Automated Approach to Negotiation of BOT Contracts

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/42896
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorLoh Ngee
    contributor authorRobert L. K. Tiong
    contributor authorJahidul Alum
    date accessioned2017-05-08T21:12:39Z
    date available2017-05-08T21:12:39Z
    date copyrightApril 1997
    date issued1997
    identifier other%28asce%290887-3801%281997%2911%3A2%28121%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42896
    description abstractBuild, operate and transfer (BOT) projects have become of increasing interest over the last few years. The BOT model entails a concession company providing the finance, design, construction, operation, and maintenance of an infrastructure project for a specified concession period. This paper deals with the negotiation of financial and contractual parameters associated with a BOT project before it is awarded to the promoter. It describes the development of an automated mechanism as an alternative approach in expediting the negotiation over a suitable pricing structure for the BOT project. The mechanism was developed by incorporating spreadsheet data into multiple linear regression models to formulate the prediction equations using the tariff, concession period, and rate of return as the variables. This approach reduces the bulk of urgent recomputations of the project cash flows during the final negotiation that would otherwise entail the use of considerable resources. The mechanisms could therefore be used as enhanced tools for dynamic negotiation between the government and the promoter for an acceptable level of tariff structure; concession period and rate of return on the promoter's investments; and for balancing the risk/return profiles of both parties.
    publisherAmerican Society of Civil Engineers
    titleAutomated Approach to Negotiation of BOT Contracts
    typeJournal Paper
    journal volume11
    journal issue2
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)0887-3801(1997)11:2(121)
    treeJournal of Computing in Civil Engineering:;1997:;Volume ( 011 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian