YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Incident Case Study of Baseline Pigging During In-Line Inspections for Corrosion Resistant Alloy Clad Pipelines

    Source: Journal of Pressure Vessel Technology:;2022:;volume( 144 ):;issue: 006::page 64503-1
    Author:
    Reda
    ,
    Ahmed;Shahin
    ,
    Mohamed A.;Sultan
    ,
    Ibrahim A.;Lagat
    ,
    Christopher;McKee
    ,
    Kristoffer K.
    DOI: 10.1115/1.4054280
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: This paper describes an incident that occurred during the baseline inspections of pre-commissioning activities performed on a 20-in. metallurgically bonded corrosion resistant alloy (CRA) clad pipeline of an approximate length equal to 2.7 km. The inspection tool, deployed as part of the baseline inspections before the startup of the pipeline, was damaged in the CRA clad pipeline. This damage occurred despite extensive computer simulations, carried out before the inspection, which indicated that the tool, an ultrasonic (UT) pig, was able to traverse the length of the pipe without major issues. The application of the pressure surges was successful in dislodging the UT pig; however, as a direct consequence, the UT pig crashed into the pig receiver and sustained significant damage. The sealing pigs that were trailing behind the UT pig also collided with the rear of the UT pig, and it was at this junction that all further data transmission was ceased. A metal swarf was discovered upon inspection of the UT pig after retrieval, indicating that the inner wall of the pipeline also sustained damage. An analysis of the swarf indicated that it comprised solely of the CRA alloy that was metallurgically bonded to the inner wall of the carbon steel pipe. It was concluded that, due to the anticorrosive nature of the CRA material and high-quality control standards upheld during the manufacture of CRA pipes, the baseline in-line and routine inspections were unnecessary and can be detrimental if the inspection tool becomes impacted, thereby compromising the containment of the CRA layer.
    • Download: (1.511Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Incident Case Study of Baseline Pigging During In-Line Inspections for Corrosion Resistant Alloy Clad Pipelines

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4287417
    Collections
    • Journal of Pressure Vessel Technology

    Show full item record

    contributor authorReda
    contributor authorAhmed;Shahin
    contributor authorMohamed A.;Sultan
    contributor authorIbrahim A.;Lagat
    contributor authorChristopher;McKee
    contributor authorKristoffer K.
    date accessioned2022-08-18T13:05:25Z
    date available2022-08-18T13:05:25Z
    date copyright5/6/2022 12:00:00 AM
    date issued2022
    identifier issn0094-9930
    identifier otherpvt_144_06_064503.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4287417
    description abstractThis paper describes an incident that occurred during the baseline inspections of pre-commissioning activities performed on a 20-in. metallurgically bonded corrosion resistant alloy (CRA) clad pipeline of an approximate length equal to 2.7 km. The inspection tool, deployed as part of the baseline inspections before the startup of the pipeline, was damaged in the CRA clad pipeline. This damage occurred despite extensive computer simulations, carried out before the inspection, which indicated that the tool, an ultrasonic (UT) pig, was able to traverse the length of the pipe without major issues. The application of the pressure surges was successful in dislodging the UT pig; however, as a direct consequence, the UT pig crashed into the pig receiver and sustained significant damage. The sealing pigs that were trailing behind the UT pig also collided with the rear of the UT pig, and it was at this junction that all further data transmission was ceased. A metal swarf was discovered upon inspection of the UT pig after retrieval, indicating that the inner wall of the pipeline also sustained damage. An analysis of the swarf indicated that it comprised solely of the CRA alloy that was metallurgically bonded to the inner wall of the carbon steel pipe. It was concluded that, due to the anticorrosive nature of the CRA material and high-quality control standards upheld during the manufacture of CRA pipes, the baseline in-line and routine inspections were unnecessary and can be detrimental if the inspection tool becomes impacted, thereby compromising the containment of the CRA layer.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleIncident Case Study of Baseline Pigging During In-Line Inspections for Corrosion Resistant Alloy Clad Pipelines
    typeJournal Paper
    journal volume144
    journal issue6
    journal titleJournal of Pressure Vessel Technology
    identifier doi10.1115/1.4054280
    journal fristpage64503-1
    journal lastpage64503-6
    page6
    treeJournal of Pressure Vessel Technology:;2022:;volume( 144 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian