YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    A Semi-Analytical Approach for Calculating Productivity Index in Vertical Flowing Well: High Gas-Oil Ratio Field Data as a Case Study

    Source: Journal of Energy Resources Technology:;2022:;volume( 144 ):;issue: 011::page 113006-1
    Author:
    Fadairo
    ,
    Adesina;Ling
    ,
    Kegang;Rasouli
    ,
    Vamegh;Adeyemi
    ,
    Gbadegesin
    DOI: 10.1115/1.4054421
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: The concurrent transport of hydrocarbon, water, and most times solids ensues all through the production system concerned in transporting multiphase fluid from the producing reservoir zone to the wellbore and then to surface. The flow capacity of a well can be estimated through the inflow performance relationship (IPR) that essentially depends on productivity index (PI). Productivity index is a vital and indispensable oil and gas industry tool for forecasting the deliverability and helps in economic feasibility studies of the well. The lack of a correct model for bottom-hole flowing pressure calculation has always been a challenge and results in erroneous estimate of productivity index of a production well. Numerous models on bottom-hole flowing pressure in wells have been recounted in different literatures over the years. Many of the earlier works were based on steady-state flow assumption, likewise not all the constituent terms that practically influence flow behavior of fluid in pipe were considered in derivation of the past models. In the present work, an enhanced semi-analytical model for determining well bottom-hole flowing pressure is offered where all the constituent terms practically influence flow behavior of fluid in pipe and employed in building the new model for estimating productivity index in a vertical well. This article builds a semi-analytical model for predicting flowing pressure at every flow transition period evidencing the water hammer pressure fluctuations often experienced at the start-up operation. Subsequently, the time-dependent flowing pressure obtained from the newly derived model was used to estimate the productivity index using high gas-oil ratio surface data from Niger Delta field. The result of productivity index obtained at steady-state period shows that the average prediction percentage error of the current approach is reduced to 3.78% compared to previously derived steady-state-based model by Guo et al. (2007, “A Rigorous Composite-IPR Model for Multilateral Wells,” Society of Petroleum Engineers, SPE 100923, San Antonio, TX, p. 11), Guo (2001, “Use of Wellhead-Pressure Data to Establish Well-Inflow Performance Relationship,” SPE Eastern Regional Meeting, Canton, OH, Oct., SPE 72372, p. 7), and Adesina et al. (2018, “A Realistic Model for Estimating Productivity Index of Vertical Well Using Wellhead Data,” Society of Petroleum Engineers, SPE-193506-MS) that, respectively, report as 18.59%, 5.23%, and 3.96%. The factors that influence the magnitude of water hammer pressure fluctuation at the start-up period have been identified through the derivation. The semi-analytical model improves the prediction accuracy and aids the reliability of design to avoid incidence of pipe burst due to pressure peak and serves as a tool to analyze the well performance.
    • Download: (357.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      A Semi-Analytical Approach for Calculating Productivity Index in Vertical Flowing Well: High Gas-Oil Ratio Field Data as a Case Study

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4287239
    Collections
    • Journal of Energy Resources Technology

    Show full item record

    contributor authorFadairo
    contributor authorAdesina;Ling
    contributor authorKegang;Rasouli
    contributor authorVamegh;Adeyemi
    contributor authorGbadegesin
    date accessioned2022-08-18T12:59:53Z
    date available2022-08-18T12:59:53Z
    date copyright5/16/2022 12:00:00 AM
    date issued2022
    identifier issn0195-0738
    identifier otherjert_144_11_113006.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4287239
    description abstractThe concurrent transport of hydrocarbon, water, and most times solids ensues all through the production system concerned in transporting multiphase fluid from the producing reservoir zone to the wellbore and then to surface. The flow capacity of a well can be estimated through the inflow performance relationship (IPR) that essentially depends on productivity index (PI). Productivity index is a vital and indispensable oil and gas industry tool for forecasting the deliverability and helps in economic feasibility studies of the well. The lack of a correct model for bottom-hole flowing pressure calculation has always been a challenge and results in erroneous estimate of productivity index of a production well. Numerous models on bottom-hole flowing pressure in wells have been recounted in different literatures over the years. Many of the earlier works were based on steady-state flow assumption, likewise not all the constituent terms that practically influence flow behavior of fluid in pipe were considered in derivation of the past models. In the present work, an enhanced semi-analytical model for determining well bottom-hole flowing pressure is offered where all the constituent terms practically influence flow behavior of fluid in pipe and employed in building the new model for estimating productivity index in a vertical well. This article builds a semi-analytical model for predicting flowing pressure at every flow transition period evidencing the water hammer pressure fluctuations often experienced at the start-up operation. Subsequently, the time-dependent flowing pressure obtained from the newly derived model was used to estimate the productivity index using high gas-oil ratio surface data from Niger Delta field. The result of productivity index obtained at steady-state period shows that the average prediction percentage error of the current approach is reduced to 3.78% compared to previously derived steady-state-based model by Guo et al. (2007, “A Rigorous Composite-IPR Model for Multilateral Wells,” Society of Petroleum Engineers, SPE 100923, San Antonio, TX, p. 11), Guo (2001, “Use of Wellhead-Pressure Data to Establish Well-Inflow Performance Relationship,” SPE Eastern Regional Meeting, Canton, OH, Oct., SPE 72372, p. 7), and Adesina et al. (2018, “A Realistic Model for Estimating Productivity Index of Vertical Well Using Wellhead Data,” Society of Petroleum Engineers, SPE-193506-MS) that, respectively, report as 18.59%, 5.23%, and 3.96%. The factors that influence the magnitude of water hammer pressure fluctuation at the start-up period have been identified through the derivation. The semi-analytical model improves the prediction accuracy and aids the reliability of design to avoid incidence of pipe burst due to pressure peak and serves as a tool to analyze the well performance.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleA Semi-Analytical Approach for Calculating Productivity Index in Vertical Flowing Well: High Gas-Oil Ratio Field Data as a Case Study
    typeJournal Paper
    journal volume144
    journal issue11
    journal titleJournal of Energy Resources Technology
    identifier doi10.1115/1.4054421
    journal fristpage113006-1
    journal lastpage113006-8
    page8
    treeJournal of Energy Resources Technology:;2022:;volume( 144 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian