YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Development of a Regulatory Mechanism for Key Stages in Public–Private Partnerships

    Source: Journal of Infrastructure Systems:;2022:;Volume ( 028 ):;issue: 003::page 04022017
    Author:
    Guanqun Shi
    ,
    Xueqing Zhang
    DOI: 10.1061/(ASCE)IS.1943-555X.0000697
    Publisher: ASCE
    Abstract: In public–private partnership (PPP) projects, the government delegates the design, construction, and maintenance of an infrastructure system to the private sector. The concessionaire is responsible for the operation over a long duration before the ownership is transferred back to the government. A key factor affecting the success of PPP projects is that concessionaires often engage in opportunistic behavior to gain extra benefits at the expense of the public interest. Corresponding regulations to curb such opportunistic behavior are necessary by governments. In the PPP context, the regulations involve life-cycle activities covering all the stages. To overcome opportunistic behavior and establish regulations, the interaction between the government and the concessionaire in various stages of a PPP project is analyzed extensively in the current study based on the principal–agent theory. Overall, this study contributes a whole-life governance model to analyze the concessionaire’s behavior at every step, and the effect on the social welfare of a PPP project investigates the interaction effects between different PPP stages and helps the government to determine a suitable incentive mechanism to decrease the occurrence of opportunistic behavior. Subsequently, a decision support system is proposed for policy implementation based on the developed model.
    • Download: (1.188Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Development of a Regulatory Mechanism for Key Stages in Public–Private Partnerships

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4286434
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorGuanqun Shi
    contributor authorXueqing Zhang
    date accessioned2022-08-18T12:19:42Z
    date available2022-08-18T12:19:42Z
    date issued2022/05/12
    identifier other%28ASCE%29IS.1943-555X.0000697.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286434
    description abstractIn public–private partnership (PPP) projects, the government delegates the design, construction, and maintenance of an infrastructure system to the private sector. The concessionaire is responsible for the operation over a long duration before the ownership is transferred back to the government. A key factor affecting the success of PPP projects is that concessionaires often engage in opportunistic behavior to gain extra benefits at the expense of the public interest. Corresponding regulations to curb such opportunistic behavior are necessary by governments. In the PPP context, the regulations involve life-cycle activities covering all the stages. To overcome opportunistic behavior and establish regulations, the interaction between the government and the concessionaire in various stages of a PPP project is analyzed extensively in the current study based on the principal–agent theory. Overall, this study contributes a whole-life governance model to analyze the concessionaire’s behavior at every step, and the effect on the social welfare of a PPP project investigates the interaction effects between different PPP stages and helps the government to determine a suitable incentive mechanism to decrease the occurrence of opportunistic behavior. Subsequently, a decision support system is proposed for policy implementation based on the developed model.
    publisherASCE
    titleDevelopment of a Regulatory Mechanism for Key Stages in Public–Private Partnerships
    typeJournal Article
    journal volume28
    journal issue3
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)IS.1943-555X.0000697
    journal fristpage04022017
    journal lastpage04022017-10
    page10
    treeJournal of Infrastructure Systems:;2022:;Volume ( 028 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian