description abstractResearch on prioritizing construction activities that are critical to the timely completion of projects rests on a range of indexes that attempt to identify the critical path and capture uncertainty in the duration of project activities. However, these indexes have been shown to have major flaws. These flaws can be classified broadly into two categories: (1) incomplete representation of an activity’s importance; and (2) problems in the mathematical representation of an activity’s importance. This paper developed a new index that addresses the shortcomings of the available schedule-based indexes. The proposed index was applied to a real-life construction project to evaluate the significance of its activities. The results confirmed the substantive influence of the structural organization of the project network on the relative importance of project activities. The key contribution of this research is to offer a richer approach to measuring the importance of construction activities by paying simultaneous attention to uncertainty in completion time, the total float, and the topological characteristics of project activities.
publisherASCE
titlePrioritizing Construction Activities: Addressing the Flaws of Schedule-Based Indexes
typeJournal Article
journal volume148
journal issue8
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0002328
journal fristpage04022069
journal lastpage04022069-12
page12
treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 008
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record