YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    The Construction Materials Conundrum: Practical Solutions to Address Integrated Supply Chain Complexities

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 008::page 04022071
    Author:
    Ryan Heaton
    ,
    Hector Martin
    ,
    Aaron Chadee
    ,
    Amrita Milling
    ,
    Sian Dunne
    ,
    Fiona Borthwick
    DOI: 10.1061/(ASCE)CO.1943-7862.0002326
    Publisher: ASCE
    Abstract: As projects evolve into complex and specialized temporary initiatives, accountability shortfalls in material flow are a major reason for schedule and cost overruns in construction. To date, researchers and practitioners are unresolved regarding the causes of material handling challenges and eminent solutions to improve material flow accountability. Consequently, inefficient supply chain management practices persist, leading to ineffective handling methods. This research, therefore, focused on identifying critical material challenges encountered by contractors and presented solutions to alleviate schedule and cost overrun failures. The fuzzy Delphi approach was used to refine opinions and achieve group consensus from 15 specialists on the ranking of material handling problems and potential solutions associated with design-build projects. The research revealed that complexity, material flow, and lack of information sharing are the top three main causes of onsite material problems. Potential solutions identified were a faster response mechanism (as an alternative to a slower build schedule), increasing material handlers’ worker power, subcontractors’ involvement in the procurement process, and prefabrication. The research highlighted subcontracting as a material handling paradox as apart from being a solution, it creates non-value-added costs in the supply chain and often inappropriately transfers risk. The findings showcased the potential to improve onsite material handling praxis by considering decision-making uncertainties in material flow and recognizing the importance of procurement methods in construction supply chain solutions in resolving scheduling and cost inefficiencies.
    • Download: (419.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      The Construction Materials Conundrum: Practical Solutions to Address Integrated Supply Chain Complexities

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4286134
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRyan Heaton
    contributor authorHector Martin
    contributor authorAaron Chadee
    contributor authorAmrita Milling
    contributor authorSian Dunne
    contributor authorFiona Borthwick
    date accessioned2022-08-18T12:10:25Z
    date available2022-08-18T12:10:25Z
    date issued2022/06/03
    identifier other%28ASCE%29CO.1943-7862.0002326.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286134
    description abstractAs projects evolve into complex and specialized temporary initiatives, accountability shortfalls in material flow are a major reason for schedule and cost overruns in construction. To date, researchers and practitioners are unresolved regarding the causes of material handling challenges and eminent solutions to improve material flow accountability. Consequently, inefficient supply chain management practices persist, leading to ineffective handling methods. This research, therefore, focused on identifying critical material challenges encountered by contractors and presented solutions to alleviate schedule and cost overrun failures. The fuzzy Delphi approach was used to refine opinions and achieve group consensus from 15 specialists on the ranking of material handling problems and potential solutions associated with design-build projects. The research revealed that complexity, material flow, and lack of information sharing are the top three main causes of onsite material problems. Potential solutions identified were a faster response mechanism (as an alternative to a slower build schedule), increasing material handlers’ worker power, subcontractors’ involvement in the procurement process, and prefabrication. The research highlighted subcontracting as a material handling paradox as apart from being a solution, it creates non-value-added costs in the supply chain and often inappropriately transfers risk. The findings showcased the potential to improve onsite material handling praxis by considering decision-making uncertainties in material flow and recognizing the importance of procurement methods in construction supply chain solutions in resolving scheduling and cost inefficiencies.
    publisherASCE
    titleThe Construction Materials Conundrum: Practical Solutions to Address Integrated Supply Chain Complexities
    typeJournal Article
    journal volume148
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002326
    journal fristpage04022071
    journal lastpage04022071-15
    page15
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian