YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Influence of Execution Speed on Displacements of Soil-Nailed Structures with Vertical Face in Urban Areas

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 007::page 04022048
    Author:
    Alexsander Silva Mucheti
    ,
    Paulo José Rocha de Albuquerque
    DOI: 10.1061/(ASCE)CO.1943-7862.0002286
    Publisher: ASCE
    Abstract: This paper presents the study of the execution speed influence on displacements of soil-nailed structures with a vertical face in urban areas, intended as the basements of buildings. Fifteen structures in the Metropolitan Region of São Paulo, Brazil, were evaluated. The main objective was to demonstrate the evolution of the construction technique, making its application possible in conditions considered by the technical community to be unfeasible due to the inevitable resulting displacements. The studied structures ranged from 6.8 to 22.7 m high. Soil-nailed walls were instrumented with displacement gauges (deflectometers) positioned near the top, which monitored the structures’ horizontal displacements. The execution time of each work was evaluated in terms of the sectoral excavation advancement, which was 3, 4, or 5 days, as well as the production in square meters per day. The results showed works that were less displaceable than the estimates proposed in the literature. The impact of execution speed also was evidenced, showing that the opening interval of new work fronts resulted in significant differences, with displacements ranging from 20 to 23 mm, from 10 to 15 mm, and from 0 to 6 mm, respectively. Two equations proposed to predict horizontal displacement based on the retaining structure height and daily work productivity are presented. The study can enable works that may be considered impractical if analyzed from the displacement premises of the literature; moreover, this study disseminates design and execution standards to obtain less-displaceable works.
    • Download: (4.978Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Influence of Execution Speed on Displacements of Soil-Nailed Structures with Vertical Face in Urban Areas

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4286106
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAlexsander Silva Mucheti
    contributor authorPaulo José Rocha de Albuquerque
    date accessioned2022-08-18T12:09:31Z
    date available2022-08-18T12:09:31Z
    date issued2022/04/22
    identifier other%28ASCE%29CO.1943-7862.0002286.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286106
    description abstractThis paper presents the study of the execution speed influence on displacements of soil-nailed structures with a vertical face in urban areas, intended as the basements of buildings. Fifteen structures in the Metropolitan Region of São Paulo, Brazil, were evaluated. The main objective was to demonstrate the evolution of the construction technique, making its application possible in conditions considered by the technical community to be unfeasible due to the inevitable resulting displacements. The studied structures ranged from 6.8 to 22.7 m high. Soil-nailed walls were instrumented with displacement gauges (deflectometers) positioned near the top, which monitored the structures’ horizontal displacements. The execution time of each work was evaluated in terms of the sectoral excavation advancement, which was 3, 4, or 5 days, as well as the production in square meters per day. The results showed works that were less displaceable than the estimates proposed in the literature. The impact of execution speed also was evidenced, showing that the opening interval of new work fronts resulted in significant differences, with displacements ranging from 20 to 23 mm, from 10 to 15 mm, and from 0 to 6 mm, respectively. Two equations proposed to predict horizontal displacement based on the retaining structure height and daily work productivity are presented. The study can enable works that may be considered impractical if analyzed from the displacement premises of the literature; moreover, this study disseminates design and execution standards to obtain less-displaceable works.
    publisherASCE
    titleInfluence of Execution Speed on Displacements of Soil-Nailed Structures with Vertical Face in Urban Areas
    typeJournal Article
    journal volume148
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002286
    journal fristpage04022048
    journal lastpage04022048-11
    page11
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian