YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Achieving Better Power Plant Guarantees Through a New Exergy-Based Approach for the HRSG

    Source: Journal of Engineering for Gas Turbines and Power:;2021:;volume( 144 ):;issue: 001::page 11008-1
    Author:
    Smith, Raub W.
    DOI: 10.1115/1.4052143
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: The best assurance an owner has to maximize the performance of the entire combined cycle power plant is the perfect alignment of heat recovery steam generator (HRSG) performance guarantee metrics to this goal. Currently, HRSG equipment performance guarantees include steam generation rates and steam temperature at each pressure level plus draft loss and reheater pressure drop. This profusion of guaranteed parameters with multiple bonus/liquidated damages (LD) rates is not always well correlated to the customer's ultimate goal of delivering power from the bottoming cycle since the behavior of each steam generation circuit is a complex function of steam pressure, steam turbine performance, and gas turbine exhaust temperature. This paper proposes a solution that normalizes and combines all HRSG performance measurements into a single value directly and reliably tied to the customer value metric (which may be different for fired and unfired operation or other load points). This is achieved by expressing the HRSG performance guarantee in terms of exergy recovered to steam and plant exergy loss attributable to the HRSG (gas side draft loss). This will be shown, with examples, to serve the goals of the customer to confirm by test that an HRSG delivers the promised steam exergy consistent with the plant level performance requirement.
    • Download: (818.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Achieving Better Power Plant Guarantees Through a New Exergy-Based Approach for the HRSG

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4284902
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorSmith, Raub W.
    date accessioned2022-05-08T09:15:06Z
    date available2022-05-08T09:15:06Z
    date copyright10/13/2021 12:00:00 AM
    date issued2021
    identifier issn0742-4795
    identifier othergtp_144_01_011008.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4284902
    description abstractThe best assurance an owner has to maximize the performance of the entire combined cycle power plant is the perfect alignment of heat recovery steam generator (HRSG) performance guarantee metrics to this goal. Currently, HRSG equipment performance guarantees include steam generation rates and steam temperature at each pressure level plus draft loss and reheater pressure drop. This profusion of guaranteed parameters with multiple bonus/liquidated damages (LD) rates is not always well correlated to the customer's ultimate goal of delivering power from the bottoming cycle since the behavior of each steam generation circuit is a complex function of steam pressure, steam turbine performance, and gas turbine exhaust temperature. This paper proposes a solution that normalizes and combines all HRSG performance measurements into a single value directly and reliably tied to the customer value metric (which may be different for fired and unfired operation or other load points). This is achieved by expressing the HRSG performance guarantee in terms of exergy recovered to steam and plant exergy loss attributable to the HRSG (gas side draft loss). This will be shown, with examples, to serve the goals of the customer to confirm by test that an HRSG delivers the promised steam exergy consistent with the plant level performance requirement.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleAchieving Better Power Plant Guarantees Through a New Exergy-Based Approach for the HRSG
    typeJournal Paper
    journal volume144
    journal issue1
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.4052143
    journal fristpage11008-1
    journal lastpage11008-6
    page6
    treeJournal of Engineering for Gas Turbines and Power:;2021:;volume( 144 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian