YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Threats to Contractor’s Cash Flow under Remeasured Public Works Contracts

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001::page 06521002
    Author:
    Omar Kandil
    ,
    Nabil Yehia
    ,
    Tarek Hamed
    DOI: 10.1061/(ASCE)LA.1943-4170.0000507
    Publisher: ASCE
    Abstract: Cash flow constitutes the bloodstream for contractors. The contractual conditions along with the legal rules are used to set the expected cash flow and entitlements for the contractor considering the executed contract. There are two types of construction contracts: private works contract and public works contract. Under public works contracts, financing is by the public fund, so some legal restrictions are made to prevent manipulation of the public benefit. Hence, this research addresses the threats to the contractor’s cash flow and entitlements stemming from the remeasurement process under public works contracts. This paper uses a multistep interdependent desktop research methodology to study the degree of compatibility of a well-known standard form of contract conditions when used under the Egyptian laws for tenders and bids because the priority of offer concept may severely affect the quantification of the contractor’s money due under the applicable contract provisions. Consequently, a conclusion will highlight some threats, which can be considered during the risk assessment carried out during the tendering phase. So the probable disputes pertaining thereto will decline. Such study may be applicable to all other Arab laws inspired by the Egyptian laws.
    • Download: (154.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Threats to Contractor’s Cash Flow under Remeasured Public Works Contracts

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4281753
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorOmar Kandil
    contributor authorNabil Yehia
    contributor authorTarek Hamed
    date accessioned2022-05-07T19:51:51Z
    date available2022-05-07T19:51:51Z
    date issued2021-09-28
    identifier other(ASCE)LA.1943-4170.0000507.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281753
    description abstractCash flow constitutes the bloodstream for contractors. The contractual conditions along with the legal rules are used to set the expected cash flow and entitlements for the contractor considering the executed contract. There are two types of construction contracts: private works contract and public works contract. Under public works contracts, financing is by the public fund, so some legal restrictions are made to prevent manipulation of the public benefit. Hence, this research addresses the threats to the contractor’s cash flow and entitlements stemming from the remeasurement process under public works contracts. This paper uses a multistep interdependent desktop research methodology to study the degree of compatibility of a well-known standard form of contract conditions when used under the Egyptian laws for tenders and bids because the priority of offer concept may severely affect the quantification of the contractor’s money due under the applicable contract provisions. Consequently, a conclusion will highlight some threats, which can be considered during the risk assessment carried out during the tendering phase. So the probable disputes pertaining thereto will decline. Such study may be applicable to all other Arab laws inspired by the Egyptian laws.
    publisherASCE
    titleThreats to Contractor’s Cash Flow under Remeasured Public Works Contracts
    typeJournal Paper
    journal volume14
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000507
    journal fristpage06521002
    journal lastpage06521002-6
    page6
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian