YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Solar Energy Engineering
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Solar Energy Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Development of a Grid Connected Solar-Wind Hybrid System With Reduction in Levelized Tariff for a Remote Island in India

    Source: Journal of Solar Energy Engineering:;2020:;volume( 142 ):;issue: 004
    Author:
    Goswami, Anik
    ,
    Sadhu, Paromita
    ,
    Sadhu, Pradip Kumar
    DOI: 10.1115/1.4046147
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Sagar Island which is located in the world's largest delta, the Sunderban, in the eastern coast of India faces severe power crunch. Due to its isolated location, the power infrastructure is underdeveloped. This has led to very unreliable power supply and frequent power cuts. The island being economically weak, power is inaccessible to most of its residents. Thus, the per unit energy consumption of the area is low and it has led to the lowering of the human development index of the area. However, Sagar Island, owing to its location, has huge solar and wind power potential. This paper discusses the prospect of developing a solar-wind hybrid power plant to supply power to the area. The developed hybrid renewable energy system (HRES) power plant will provide uninterrupted power to the island. Results show that the levelized cost of electricity (LCOE) from the proposed power plant is 0.03707 $/kWh, which is lower than the LCOE from the available grid. Lowering the cost of electricity will make electricity accessible to most of the inhabitants of the island. This will, in turn, increase the per unit energy consumption and hence the human development index. The proposed power plant will also help the environment by reducing CO2 emissions by 1894.08 tonnes annually. It will also save 587.39 tonnes of coal in its lifetime. Hence, the HRES power plant will make power accessible and also help Sagar Island to become a renewable fed “Green Island.”
    • Download: (671.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Development of a Grid Connected Solar-Wind Hybrid System With Reduction in Levelized Tariff for a Remote Island in India

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4274280
    Collections
    • Journal of Solar Energy Engineering

    Show full item record

    contributor authorGoswami, Anik
    contributor authorSadhu, Paromita
    contributor authorSadhu, Pradip Kumar
    date accessioned2022-02-04T14:44:35Z
    date available2022-02-04T14:44:35Z
    date copyright2020/02/06/
    date issued2020
    identifier issn0199-6231
    identifier othersol_142_4_044501.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4274280
    description abstractSagar Island which is located in the world's largest delta, the Sunderban, in the eastern coast of India faces severe power crunch. Due to its isolated location, the power infrastructure is underdeveloped. This has led to very unreliable power supply and frequent power cuts. The island being economically weak, power is inaccessible to most of its residents. Thus, the per unit energy consumption of the area is low and it has led to the lowering of the human development index of the area. However, Sagar Island, owing to its location, has huge solar and wind power potential. This paper discusses the prospect of developing a solar-wind hybrid power plant to supply power to the area. The developed hybrid renewable energy system (HRES) power plant will provide uninterrupted power to the island. Results show that the levelized cost of electricity (LCOE) from the proposed power plant is 0.03707 $/kWh, which is lower than the LCOE from the available grid. Lowering the cost of electricity will make electricity accessible to most of the inhabitants of the island. This will, in turn, increase the per unit energy consumption and hence the human development index. The proposed power plant will also help the environment by reducing CO2 emissions by 1894.08 tonnes annually. It will also save 587.39 tonnes of coal in its lifetime. Hence, the HRES power plant will make power accessible and also help Sagar Island to become a renewable fed “Green Island.”
    publisherThe American Society of Mechanical Engineers (ASME)
    titleDevelopment of a Grid Connected Solar-Wind Hybrid System With Reduction in Levelized Tariff for a Remote Island in India
    typeJournal Paper
    journal volume142
    journal issue4
    journal titleJournal of Solar Energy Engineering
    identifier doi10.1115/1.4046147
    page44501
    treeJournal of Solar Energy Engineering:;2020:;volume( 142 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian