YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Effects of Sampling and Interpolation Methods on Accuracy of Extracted Watershed Features

    Source: Journal of Hydrologic Engineering:;2021:;Volume ( 026 ):;issue: 003::page 05020053-1
    Author:
    Jingwei Hou
    ,
    Meiyan Zheng
    ,
    Moyan Zhu
    ,
    Yanjuan Wang
    DOI: 10.1061/(ASCE)HE.1943-5584.0002060
    Publisher: ASCE
    Abstract: High-accuracy watershed features can be used as hydrological parameters of a distributed hydrological model and a nonpoint source pollution model. A total of 3,863 elevation points in Haizi Watershed, China, are collected to produce a basic digital elevation model (DEM). Spline, kriging, and inverse distance weighting methods are selected to interpolate different sample sizes obtained by different sampling methods. A total of 105 DEMs are constructed to extract river networks, outfalls, and watersheds. The accuracies of watershed features are evaluated by using root-mean-square error, and the errors of outfall position, river network closure (crossings of the actual and the extracted river networks), river network density, and watershed area. The results show that the accuracies of DEMs and watershed features increase with an increase in sample size. Sample size, sampling method, and interpolation method have significant impacts on the accuracies of DEMs, outfall position, river network closure, and watershed area. Sample size is most important for deriving watershed features. The optimal combinations of sample size, sampling method, and interpolation method can improve the accuracies of watershed features.
    • Download: (2.523Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Effects of Sampling and Interpolation Methods on Accuracy of Extracted Watershed Features

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4271578
    Collections
    • Journal of Hydrologic Engineering

    Show full item record

    contributor authorJingwei Hou
    contributor authorMeiyan Zheng
    contributor authorMoyan Zhu
    contributor authorYanjuan Wang
    date accessioned2022-02-01T00:31:41Z
    date available2022-02-01T00:31:41Z
    date issued3/1/2021
    identifier other%28ASCE%29HE.1943-5584.0002060.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271578
    description abstractHigh-accuracy watershed features can be used as hydrological parameters of a distributed hydrological model and a nonpoint source pollution model. A total of 3,863 elevation points in Haizi Watershed, China, are collected to produce a basic digital elevation model (DEM). Spline, kriging, and inverse distance weighting methods are selected to interpolate different sample sizes obtained by different sampling methods. A total of 105 DEMs are constructed to extract river networks, outfalls, and watersheds. The accuracies of watershed features are evaluated by using root-mean-square error, and the errors of outfall position, river network closure (crossings of the actual and the extracted river networks), river network density, and watershed area. The results show that the accuracies of DEMs and watershed features increase with an increase in sample size. Sample size, sampling method, and interpolation method have significant impacts on the accuracies of DEMs, outfall position, river network closure, and watershed area. Sample size is most important for deriving watershed features. The optimal combinations of sample size, sampling method, and interpolation method can improve the accuracies of watershed features.
    publisherASCE
    titleEffects of Sampling and Interpolation Methods on Accuracy of Extracted Watershed Features
    typeJournal Paper
    journal volume26
    journal issue3
    journal titleJournal of Hydrologic Engineering
    identifier doi10.1061/(ASCE)HE.1943-5584.0002060
    journal fristpage05020053-1
    journal lastpage05020053-13
    page13
    treeJournal of Hydrologic Engineering:;2021:;Volume ( 026 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian