Effects of Sampling and Interpolation Methods on Accuracy of Extracted Watershed FeaturesSource: Journal of Hydrologic Engineering:;2021:;Volume ( 026 ):;issue: 003::page 05020053-1DOI: 10.1061/(ASCE)HE.1943-5584.0002060Publisher: ASCE
Abstract: High-accuracy watershed features can be used as hydrological parameters of a distributed hydrological model and a nonpoint source pollution model. A total of 3,863 elevation points in Haizi Watershed, China, are collected to produce a basic digital elevation model (DEM). Spline, kriging, and inverse distance weighting methods are selected to interpolate different sample sizes obtained by different sampling methods. A total of 105 DEMs are constructed to extract river networks, outfalls, and watersheds. The accuracies of watershed features are evaluated by using root-mean-square error, and the errors of outfall position, river network closure (crossings of the actual and the extracted river networks), river network density, and watershed area. The results show that the accuracies of DEMs and watershed features increase with an increase in sample size. Sample size, sampling method, and interpolation method have significant impacts on the accuracies of DEMs, outfall position, river network closure, and watershed area. Sample size is most important for deriving watershed features. The optimal combinations of sample size, sampling method, and interpolation method can improve the accuracies of watershed features.
|
Collections
Show full item record
| contributor author | Jingwei Hou | |
| contributor author | Meiyan Zheng | |
| contributor author | Moyan Zhu | |
| contributor author | Yanjuan Wang | |
| date accessioned | 2022-02-01T00:31:41Z | |
| date available | 2022-02-01T00:31:41Z | |
| date issued | 3/1/2021 | |
| identifier other | %28ASCE%29HE.1943-5584.0002060.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4271578 | |
| description abstract | High-accuracy watershed features can be used as hydrological parameters of a distributed hydrological model and a nonpoint source pollution model. A total of 3,863 elevation points in Haizi Watershed, China, are collected to produce a basic digital elevation model (DEM). Spline, kriging, and inverse distance weighting methods are selected to interpolate different sample sizes obtained by different sampling methods. A total of 105 DEMs are constructed to extract river networks, outfalls, and watersheds. The accuracies of watershed features are evaluated by using root-mean-square error, and the errors of outfall position, river network closure (crossings of the actual and the extracted river networks), river network density, and watershed area. The results show that the accuracies of DEMs and watershed features increase with an increase in sample size. Sample size, sampling method, and interpolation method have significant impacts on the accuracies of DEMs, outfall position, river network closure, and watershed area. Sample size is most important for deriving watershed features. The optimal combinations of sample size, sampling method, and interpolation method can improve the accuracies of watershed features. | |
| publisher | ASCE | |
| title | Effects of Sampling and Interpolation Methods on Accuracy of Extracted Watershed Features | |
| type | Journal Paper | |
| journal volume | 26 | |
| journal issue | 3 | |
| journal title | Journal of Hydrologic Engineering | |
| identifier doi | 10.1061/(ASCE)HE.1943-5584.0002060 | |
| journal fristpage | 05020053-1 | |
| journal lastpage | 05020053-13 | |
| page | 13 | |
| tree | Journal of Hydrologic Engineering:;2021:;Volume ( 026 ):;issue: 003 | |
| contenttype | Fulltext |