YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Microeconomic Ensemble Modeling to Inform Robust Adaptation to Water Scarcity in Irrigated Agriculture

    Source: Journal of Water Resources Planning and Management:;2021:;Volume ( 147 ):;issue: 007::page 04021038-1
    Author:
    C. Dionisio Pérez-Blanco
    ,
    Carlos Gutiérrez-Martín
    ,
    Laura Gil-García
    ,
    Nazaret M. Montilla-López
    DOI: 10.1061/(ASCE)WR.1943-5452.0001385
    Publisher: ASCE
    Abstract: This paper compares the economic performance of a dam construction strategy versus a no dam construction (i.e., the statu quo) strategy under multiple scenarios and using a multimodel ensemble of three microeconomic mathematical programming models. The result is a database of simulations representing multiple plausible futures which offers information on uncertainty regarding scenario assumptions and model structure (through the ensemble spread). Using an iterative robust decision-making framework, simulation results are coupled with experts’ knowledge and opinion to detect vulnerabilities in the proposed strategies, quantify potential trade-offs between responses, and identify a robust adaptation strategy. Methods are illustrated as applied to the Órbigo Catchment in Northwestern Spain, where the Douro River Basin Authority (DRBA) will decide in the coming months whether to build two dams to enhance irrigation water supply and reliability. Simulation results show that, for most scenarios and models considered, dam construction costs lead to water prices beyond the willingness of local cereal-growing irrigators to pay. Following a robust decision-making process, parties to the decision unanimously declared the status quo (i.e., no dam construction) strategy to be preferred to the dam construction strategy. This outcome substantiates the need for economic assessments of dam construction projects that account for nonlinear responses by agents to complement technical assessments in decision making.
    • Download: (2.501Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Microeconomic Ensemble Modeling to Inform Robust Adaptation to Water Scarcity in Irrigated Agriculture

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4270616
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorC. Dionisio Pérez-Blanco
    contributor authorCarlos Gutiérrez-Martín
    contributor authorLaura Gil-García
    contributor authorNazaret M. Montilla-López
    date accessioned2022-01-31T23:56:33Z
    date available2022-01-31T23:56:33Z
    date issued7/1/2021
    identifier other%28ASCE%29WR.1943-5452.0001385.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4270616
    description abstractThis paper compares the economic performance of a dam construction strategy versus a no dam construction (i.e., the statu quo) strategy under multiple scenarios and using a multimodel ensemble of three microeconomic mathematical programming models. The result is a database of simulations representing multiple plausible futures which offers information on uncertainty regarding scenario assumptions and model structure (through the ensemble spread). Using an iterative robust decision-making framework, simulation results are coupled with experts’ knowledge and opinion to detect vulnerabilities in the proposed strategies, quantify potential trade-offs between responses, and identify a robust adaptation strategy. Methods are illustrated as applied to the Órbigo Catchment in Northwestern Spain, where the Douro River Basin Authority (DRBA) will decide in the coming months whether to build two dams to enhance irrigation water supply and reliability. Simulation results show that, for most scenarios and models considered, dam construction costs lead to water prices beyond the willingness of local cereal-growing irrigators to pay. Following a robust decision-making process, parties to the decision unanimously declared the status quo (i.e., no dam construction) strategy to be preferred to the dam construction strategy. This outcome substantiates the need for economic assessments of dam construction projects that account for nonlinear responses by agents to complement technical assessments in decision making.
    publisherASCE
    titleMicroeconomic Ensemble Modeling to Inform Robust Adaptation to Water Scarcity in Irrigated Agriculture
    typeJournal Paper
    journal volume147
    journal issue7
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0001385
    journal fristpage04021038-1
    journal lastpage04021038-15
    page15
    treeJournal of Water Resources Planning and Management:;2021:;Volume ( 147 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian