YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Determination of Effective Delay-Avoidance Practices in Construction Projects

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 001::page 04520039-1
    Author:
    Yiannis Vacanas
    ,
    Chris Danezis
    DOI: 10.1061/(ASCE)LA.1943-4170.0000438
    Publisher: ASCE
    Abstract: Delay poses a significant issue for the worldwide construction industry and national economies. Numerous research endeavors have been carried out to shed light on the sources of delay, among which some employ statistical approaches to consider the perceptions of the industry’s main stakeholders. However, only a few suggest practices for delay mitigation but without considering their importance as perceived by the involved parties, which is crucial for appreciating their acceptance by the stakeholders and assess their immediate applicability. This research proposes an integrated statistical approach to determine the main delay sources, and identify the most effective, commonly accepted practices to promote delay mitigation. The perception of stakeholders was investigated via parametric and nonparametric methods. The results showed that, although there is an a priori disagreement in the perception of each party with respect to delay responsibility, commonly accepted delay mitigation practices can be successfully identified and thereby proposed.
    • Download: (229.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Determination of Effective Delay-Avoidance Practices in Construction Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4269766
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorYiannis Vacanas
    contributor authorChris Danezis
    date accessioned2022-01-31T23:27:52Z
    date available2022-01-31T23:27:52Z
    date issued2/1/2021
    identifier other%28ASCE%29LA.1943-4170.0000438.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269766
    description abstractDelay poses a significant issue for the worldwide construction industry and national economies. Numerous research endeavors have been carried out to shed light on the sources of delay, among which some employ statistical approaches to consider the perceptions of the industry’s main stakeholders. However, only a few suggest practices for delay mitigation but without considering their importance as perceived by the involved parties, which is crucial for appreciating their acceptance by the stakeholders and assess their immediate applicability. This research proposes an integrated statistical approach to determine the main delay sources, and identify the most effective, commonly accepted practices to promote delay mitigation. The perception of stakeholders was investigated via parametric and nonparametric methods. The results showed that, although there is an a priori disagreement in the perception of each party with respect to delay responsibility, commonly accepted delay mitigation practices can be successfully identified and thereby proposed.
    publisherASCE
    titleDetermination of Effective Delay-Avoidance Practices in Construction Projects
    typeJournal Paper
    journal volume13
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000438
    journal fristpage04520039-1
    journal lastpage04520039-9
    page9
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian