YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Prestressed MF-FRP: Experimental Study of Rapid Retrofit Solution for Deteriorated Prestressed C-Channel Beams

    Source: Journal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 001::page 04020124
    Author:
    Brad C. McCoy
    ,
    Zakariya Bourara
    ,
    Gregory W. Lucier
    ,
    Rudolf Seracino
    ,
    Min Liu
    ,
    Sheng-Hsuan Lin
    DOI: 10.1061/(ASCE)CF.1943-5509.0001536
    Publisher: ASCE
    Abstract: This paper presents design and installation details and full-scale test results for a prestressed mechanically fastened fiber-reinforced polymer (MF-FRP) retrofit solution that restores the original operating and inventory rating of prestressed concrete C-channel bridge superstructures with prestress losses due to concrete deterioration and steel corrosion. A retrofit solution that can be installed rapidly and immediately restores prestress losses is desired to minimize impacts on commerce, public transportation, and emergency services. Six 9.41-m (30-ft) long C-channel beams were tested for three-point bending to failure. The results of the experimental study indicate that the MF-FRP retrofit is capable of immediately restoring deteriorated C-channel beams with a 36% reduction in capacity from the original operating and inventory ratings. In this study, the reduction in the capacity of the C-channel beams was induced in the lab by cutting the bottom strand of each stem of the C-channel beam to simulate total prestress losses at the point of maximum internal moment. Further, the results of the experimental study indicate that the examined MF-FRP retrofit solution can be installed in 4.1 labor hours per retrofitted C-channel beam. Therefore, a four-worker DOT maintenance crew can install the retrofit on up to seven beams in a single eight-hour workday. A layered sectional analysis can be used to predict the flexural capacity of retrofitted C-channel beams with very good accuracy.
    • Download: (2.676Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Prestressed MF-FRP: Experimental Study of Rapid Retrofit Solution for Deteriorated Prestressed C-Channel Beams

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4269615
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorBrad C. McCoy
    contributor authorZakariya Bourara
    contributor authorGregory W. Lucier
    contributor authorRudolf Seracino
    contributor authorMin Liu
    contributor authorSheng-Hsuan Lin
    date accessioned2022-01-30T22:47:32Z
    date available2022-01-30T22:47:32Z
    date issued2/1/2021
    identifier other(ASCE)CF.1943-5509.0001536.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269615
    description abstractThis paper presents design and installation details and full-scale test results for a prestressed mechanically fastened fiber-reinforced polymer (MF-FRP) retrofit solution that restores the original operating and inventory rating of prestressed concrete C-channel bridge superstructures with prestress losses due to concrete deterioration and steel corrosion. A retrofit solution that can be installed rapidly and immediately restores prestress losses is desired to minimize impacts on commerce, public transportation, and emergency services. Six 9.41-m (30-ft) long C-channel beams were tested for three-point bending to failure. The results of the experimental study indicate that the MF-FRP retrofit is capable of immediately restoring deteriorated C-channel beams with a 36% reduction in capacity from the original operating and inventory ratings. In this study, the reduction in the capacity of the C-channel beams was induced in the lab by cutting the bottom strand of each stem of the C-channel beam to simulate total prestress losses at the point of maximum internal moment. Further, the results of the experimental study indicate that the examined MF-FRP retrofit solution can be installed in 4.1 labor hours per retrofitted C-channel beam. Therefore, a four-worker DOT maintenance crew can install the retrofit on up to seven beams in a single eight-hour workday. A layered sectional analysis can be used to predict the flexural capacity of retrofitted C-channel beams with very good accuracy.
    publisherASCE
    titlePrestressed MF-FRP: Experimental Study of Rapid Retrofit Solution for Deteriorated Prestressed C-Channel Beams
    typeJournal Paper
    journal volume35
    journal issue1
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001536
    journal fristpage04020124
    journal lastpage04020124-17
    page17
    treeJournal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian