YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Integrated Probabilistic Delay Analysis Method to Estimate Expected Outcome of Construction Delay Disputes

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 001::page 04520037
    Author:
    Sinasi Bektas
    ,
    M. Talat Birgonul
    ,
    Irem Dikmen
    DOI: 10.1061/(ASCE)LA.1943-4170.0000439
    Publisher: ASCE
    Abstract: Delays are almost inevitable in construction projects. They can have a devastating effects on the project. Therefore, proper analysis of delays and apportionment of liability is of utmost importance. Parties to construction contracts frequently employ various delay analysis methods to find out their entitlement to extension of time, or liquidated and ascertained damages. More often than not, technical analysis of delays performed by the parties yield distinct results even if the parties employ the same delay analysis method due to the lack of an in depth analysis of legal issues. This analysis is generally left to the courts where judges and experts undertake an interdisciplinary study to apportion the delay attributable to each party. Legal analysis, carried out before embarking on costly court proceedings, has the potential to provide the parties with the likely outcome of their dispute should they decide to take their dispute to the courts. This study proposes the integrated probabilistic delay analysis method (IPDAM), which integrates technical and legal analysis steps of a delay analysis study to estimate the likely outcome of construction delay disputes should the parties decide to take their dispute to the courts. It has been demonstrated in a case study that the IPDAM is practicable even in complicated construction delay cases. The IPDAM is of value to the parties because it provides them with the likely outcome of their dispute with a reasonable degree of precision. Therefore, they can have the opportunity to make informed decisions whether to pursue costly proceedings or not.
    • Download: (2.228Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Integrated Probabilistic Delay Analysis Method to Estimate Expected Outcome of Construction Delay Disputes

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4269365
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorSinasi Bektas
    contributor authorM. Talat Birgonul
    contributor authorIrem Dikmen
    date accessioned2022-01-30T22:39:42Z
    date available2022-01-30T22:39:42Z
    date issued2/1/2021
    identifier other(ASCE)LA.1943-4170.0000439.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269365
    description abstractDelays are almost inevitable in construction projects. They can have a devastating effects on the project. Therefore, proper analysis of delays and apportionment of liability is of utmost importance. Parties to construction contracts frequently employ various delay analysis methods to find out their entitlement to extension of time, or liquidated and ascertained damages. More often than not, technical analysis of delays performed by the parties yield distinct results even if the parties employ the same delay analysis method due to the lack of an in depth analysis of legal issues. This analysis is generally left to the courts where judges and experts undertake an interdisciplinary study to apportion the delay attributable to each party. Legal analysis, carried out before embarking on costly court proceedings, has the potential to provide the parties with the likely outcome of their dispute should they decide to take their dispute to the courts. This study proposes the integrated probabilistic delay analysis method (IPDAM), which integrates technical and legal analysis steps of a delay analysis study to estimate the likely outcome of construction delay disputes should the parties decide to take their dispute to the courts. It has been demonstrated in a case study that the IPDAM is practicable even in complicated construction delay cases. The IPDAM is of value to the parties because it provides them with the likely outcome of their dispute with a reasonable degree of precision. Therefore, they can have the opportunity to make informed decisions whether to pursue costly proceedings or not.
    publisherASCE
    titleIntegrated Probabilistic Delay Analysis Method to Estimate Expected Outcome of Construction Delay Disputes
    typeJournal Paper
    journal volume13
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000439
    journal fristpage04520037
    journal lastpage04520037-18
    page18
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian