YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Infrastructure Project Investment Decision Timing Using a Real Options Analysis Framework with Rainbow Option

    Source: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2020:;Volume ( 006 ):;issue: 003
    Author:
    Jatupol Siripongvakin
    ,
    Nathee Athigakunagorn
    DOI: 10.1061/AJRUA6.0001080
    Publisher: ASCE
    Abstract: The infrastructure construction industry has always been plagued with significant uncertainty. It is therefore crucial for decision makers (DMs) to ascertain suitable investment timing, and there is still a need for a paradigm to assist them. Real options analysis (ROA) is a project evaluation method that allows DMs to incorporate volatility into their analyses. This study uses ROA to create a decision framework to determine the optimal infrastructure investment decision timing. Two types of ROA, the traditional option and the rainbow option, are used in the analysis to examine the impacts of these methods on timing. The paper’s case study involves construction of a gas station in the Bangkok metropolitan region and takes the price of and demand for gas as the sources of uncertainty. The paper also carries out a loss value analysis. The results suggest that the DM should postpone the decision further when volatility increases due to a “wait-and-see” strategy. We introduce loss value to compensate for depreciation in the value of the project due to deferment. The results of the evaluation and the sensitivity analysis confirm that compared to nonconsideration of investment value, consideration can lead to an earlier optimal time for the investment.
    • Download: (2.651Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Infrastructure Project Investment Decision Timing Using a Real Options Analysis Framework with Rainbow Option

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4268000
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

    Show full item record

    contributor authorJatupol Siripongvakin
    contributor authorNathee Athigakunagorn
    date accessioned2022-01-30T21:19:19Z
    date available2022-01-30T21:19:19Z
    date issued9/1/2020 12:00:00 AM
    identifier otherAJRUA6.0001080.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268000
    description abstractThe infrastructure construction industry has always been plagued with significant uncertainty. It is therefore crucial for decision makers (DMs) to ascertain suitable investment timing, and there is still a need for a paradigm to assist them. Real options analysis (ROA) is a project evaluation method that allows DMs to incorporate volatility into their analyses. This study uses ROA to create a decision framework to determine the optimal infrastructure investment decision timing. Two types of ROA, the traditional option and the rainbow option, are used in the analysis to examine the impacts of these methods on timing. The paper’s case study involves construction of a gas station in the Bangkok metropolitan region and takes the price of and demand for gas as the sources of uncertainty. The paper also carries out a loss value analysis. The results suggest that the DM should postpone the decision further when volatility increases due to a “wait-and-see” strategy. We introduce loss value to compensate for depreciation in the value of the project due to deferment. The results of the evaluation and the sensitivity analysis confirm that compared to nonconsideration of investment value, consideration can lead to an earlier optimal time for the investment.
    publisherASCE
    titleInfrastructure Project Investment Decision Timing Using a Real Options Analysis Framework with Rainbow Option
    typeJournal Paper
    journal volume6
    journal issue3
    journal titleASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    identifier doi10.1061/AJRUA6.0001080
    page12
    treeASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2020:;Volume ( 006 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian