YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Developing Operation Procedures for Individual Reservoirs in a Large Multistate River Basin in Context of Tribunal Awards

    Source: Journal of Water Resources Planning and Management:;2020:;Volume ( 146 ):;issue: 008
    Author:
    Manmohan Kumar Goel
    ,
    Sharad Kumar Jain
    ,
    Deepti Rani
    ,
    G. V. Subrahmanyam
    ,
    M. Visweswararao
    DOI: 10.1061/(ASCE)WR.1943-5452.0001253
    Publisher: ASCE
    Abstract: The uncertain nature of monsoon and the high temporal and spatial variability of rainfall in India make it imperative to utilize the available water resources optimally and efficiently. Reservoirs are one of the most effective means of matching the temporal and spatial availability of water with demands. In India, the state governments are considered custodians of the water in their respective states. Sometimes, water-sharing disputes arise in large river basins that are shared by multiple states. A mechanism to resolve such disputes is through tribunals, which allocate the basin waters to different states and projects in accordance with their past and projected demands, water availability at different dependability levels, and other constraints. In such basins, the operation of individual projects/reservoirs, so as to follow all the stipulations of the tribunal, is a challenging task. In this paper, a methodology has been framed to develop the operation procedure for individual projects so as to honor the tribunal awards. The Krishna River basin in India has been used as an example case study. The proposed procedure keeps track of the total inflows received, the total water used, and the balance utilizations to be made at each project, each state, and the whole river basin in real time. Using this procedure, the percent utilization achieved by different sharing states of the Krishna basin, especially in deficit years, is quite close to the values specified by the tribunal. The developed methodology is quite general and can be applied to any river basin with suitable modifications.
    • Download: (1.912Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Developing Operation Procedures for Individual Reservoirs in a Large Multistate River Basin in Context of Tribunal Awards

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4267890
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorManmohan Kumar Goel
    contributor authorSharad Kumar Jain
    contributor authorDeepti Rani
    contributor authorG. V. Subrahmanyam
    contributor authorM. Visweswararao
    date accessioned2022-01-30T21:15:29Z
    date available2022-01-30T21:15:29Z
    date issued8/1/2020 12:00:00 AM
    identifier other%28ASCE%29WR.1943-5452.0001253.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267890
    description abstractThe uncertain nature of monsoon and the high temporal and spatial variability of rainfall in India make it imperative to utilize the available water resources optimally and efficiently. Reservoirs are one of the most effective means of matching the temporal and spatial availability of water with demands. In India, the state governments are considered custodians of the water in their respective states. Sometimes, water-sharing disputes arise in large river basins that are shared by multiple states. A mechanism to resolve such disputes is through tribunals, which allocate the basin waters to different states and projects in accordance with their past and projected demands, water availability at different dependability levels, and other constraints. In such basins, the operation of individual projects/reservoirs, so as to follow all the stipulations of the tribunal, is a challenging task. In this paper, a methodology has been framed to develop the operation procedure for individual projects so as to honor the tribunal awards. The Krishna River basin in India has been used as an example case study. The proposed procedure keeps track of the total inflows received, the total water used, and the balance utilizations to be made at each project, each state, and the whole river basin in real time. Using this procedure, the percent utilization achieved by different sharing states of the Krishna basin, especially in deficit years, is quite close to the values specified by the tribunal. The developed methodology is quite general and can be applied to any river basin with suitable modifications.
    publisherASCE
    titleDeveloping Operation Procedures for Individual Reservoirs in a Large Multistate River Basin in Context of Tribunal Awards
    typeJournal Paper
    journal volume146
    journal issue8
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0001253
    page12
    treeJournal of Water Resources Planning and Management:;2020:;Volume ( 146 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian