YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Well-Induced Stream Depletion and Groundwater Return Flow: Estimating Impact Schedules with a Finite-Difference Spreadsheet

    Source: Journal of Water Resources Planning and Management:;2020:;Volume ( 146 ):;issue: 007
    Author:
    Samuel Collin Robinson
    DOI: 10.1061/(ASCE)WR.1943-5452.0001230
    Publisher: ASCE
    Abstract: Allocation of water from stream-aquifer systems must account for stream depletion from well withdrawal and for accretion from groundwater return flow. Both are subject to attenuation and delay. Transient impact assessment tools include: simplified analytical solutions; special finite-difference groundwater modeling software, such as MODFLOW; and the Delayed Impact Calculator (Calculator), a spreadsheet programmed by the author for streamlined finite-difference estimation of dynamic schedules. Well-induced stream depletion results from the Calculator are compared to results from established tools for a previously documented scenario. Similar comparisons are described for modified cases. Calculator results match MODFLOW (version 1.12.00) results (y=1.0000x, r2=1.0000, 3 sets, 90 pairs each). The finite-difference tools estimate somewhat quicker stream response to groundwater impulse than do analytical solutions derived for ideal semi-infinite aquifers. A previously documented schedule estimate for a simple groundwater return flow scenario is confirmed by the Calculator. An example of Calculator utility is given, treating return flow to a reach above an active surface diversion.
    • Download: (566.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Well-Induced Stream Depletion and Groundwater Return Flow: Estimating Impact Schedules with a Finite-Difference Spreadsheet

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4267871
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorSamuel Collin Robinson
    date accessioned2022-01-30T21:14:49Z
    date available2022-01-30T21:14:49Z
    date issued7/1/2020 12:00:00 AM
    identifier other%28ASCE%29WR.1943-5452.0001230.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267871
    description abstractAllocation of water from stream-aquifer systems must account for stream depletion from well withdrawal and for accretion from groundwater return flow. Both are subject to attenuation and delay. Transient impact assessment tools include: simplified analytical solutions; special finite-difference groundwater modeling software, such as MODFLOW; and the Delayed Impact Calculator (Calculator), a spreadsheet programmed by the author for streamlined finite-difference estimation of dynamic schedules. Well-induced stream depletion results from the Calculator are compared to results from established tools for a previously documented scenario. Similar comparisons are described for modified cases. Calculator results match MODFLOW (version 1.12.00) results (y=1.0000x, r2=1.0000, 3 sets, 90 pairs each). The finite-difference tools estimate somewhat quicker stream response to groundwater impulse than do analytical solutions derived for ideal semi-infinite aquifers. A previously documented schedule estimate for a simple groundwater return flow scenario is confirmed by the Calculator. An example of Calculator utility is given, treating return flow to a reach above an active surface diversion.
    publisherASCE
    titleWell-Induced Stream Depletion and Groundwater Return Flow: Estimating Impact Schedules with a Finite-Difference Spreadsheet
    typeJournal Paper
    journal volume146
    journal issue7
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0001230
    page7
    treeJournal of Water Resources Planning and Management:;2020:;Volume ( 146 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian