YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Strategies to Leverage Contractor Experience

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 003
    Author:
    Mohamed Diab
    ,
    Richard J. Gebken
    ,
    Mohammed S. Hashem Mehany
    DOI: 10.1061/(ASCE)LA.1943-4170.0000396
    Publisher: ASCE
    Abstract: The construction manager/general contractor project delivery method is a relatively new approach for contracting public infrastructure projects in America. While added later to the Federal Highway Administration (FHWA) Special Experimental Project No. 14 (SEP-14) program to investigate innovative contracting methods, state departments of transportation are only now beginning to more widely adopt this methodology. This paper analyzes a case study project to relocate Highway 53 in Saint Louis County, Minnesota—a Minnesota Department of Transportation (MnDOT) project that is one of only a handful of federally funded projects that have been completed under this project delivery method. Based on first-hand experience, key project participant interviews, and construction document analysis, the authors detail the procedures and processes used to leverage contractor experience and knowledge in order to minimize project risks and utilize project funding more efficiently. The goal of this paper is to provide industry practitioners with a comprehensive set of tools and practices that can be utilized on future projects looking to implement this project delivery method.
    • Download: (1.451Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Strategies to Leverage Contractor Experience

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4267063
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorMohamed Diab
    contributor authorRichard J. Gebken
    contributor authorMohammed S. Hashem Mehany
    date accessioned2022-01-30T20:45:34Z
    date available2022-01-30T20:45:34Z
    date issued8/1/2020 12:00:00 AM
    identifier other%28ASCE%29LA.1943-4170.0000396.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267063
    description abstractThe construction manager/general contractor project delivery method is a relatively new approach for contracting public infrastructure projects in America. While added later to the Federal Highway Administration (FHWA) Special Experimental Project No. 14 (SEP-14) program to investigate innovative contracting methods, state departments of transportation are only now beginning to more widely adopt this methodology. This paper analyzes a case study project to relocate Highway 53 in Saint Louis County, Minnesota—a Minnesota Department of Transportation (MnDOT) project that is one of only a handful of federally funded projects that have been completed under this project delivery method. Based on first-hand experience, key project participant interviews, and construction document analysis, the authors detail the procedures and processes used to leverage contractor experience and knowledge in order to minimize project risks and utilize project funding more efficiently. The goal of this paper is to provide industry practitioners with a comprehensive set of tools and practices that can be utilized on future projects looking to implement this project delivery method.
    publisherASCE
    titleStrategies to Leverage Contractor Experience
    typeJournal Paper
    journal volume12
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000396
    page10
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian