YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Pivotal New Roles and Changes Introduced by the 2017 FIDIC’s Claim and Dispute Resolution Mechanism

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author:
    Mohammad Barakat
    ,
    Mohamed-Asem Abdul-Malak
    ,
    Hiam Khoury
    DOI: 10.1061/(ASCE)LA.1943-4170.0000355
    Publisher: ASCE
    Abstract: The inevitable nature of claims and disputes in construction projects necessitates effective administration and resolution mechanisms. To this end, mechanisms stipulated in the standard contract forms in use are frequently streamlined to address issues pertaining to their application in practice and to become more aligned with the laws prevailing over their use. The case of the widely accepted standard conditions by the International Federation of Consulting Engineers (FIDIC) is not an exception, with the latest release having taken place at the end of 2017. In this overdue release, major changes have been introduced that appear to be driven by the need to promote dispute avoidance and ensure a regulated progression of claims along the claim and dispute timeline. As such, the objective of the work presented in this paper was twofold: (1) to conduct a thorough review and detailed analyses of the newly released conditions pertaining to the initiation of claims and their progression into disputes, and (2) to provide a systematic comparison of these conditions with those of the previous release made in 1999. The findings revealed significant changes that involve (1) new roles required of both the engineer and the employer (owner) in relation to assessing the validity of the claim notice and the satisfaction of the claim contractual basis requirements, (2) an augmented consultative role for the engineer in reaching agreement before resorting to the issuance of a determination, (3) giving the engineer’s already binding determination the possibility of becoming final, and (4) regulating the timing of the possible referral of the matter in dispute to adjudication. Finally, the newly inherent dispute avoidance approach has been highlighted through the offered comparative time-bar analysis.
    • Download: (1.579Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Pivotal New Roles and Changes Introduced by the 2017 FIDIC’s Claim and Dispute Resolution Mechanism

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4265996
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorMohammad Barakat
    contributor authorMohamed-Asem Abdul-Malak
    contributor authorHiam Khoury
    date accessioned2022-01-30T19:47:49Z
    date available2022-01-30T19:47:49Z
    date issued2020
    identifier other%28ASCE%29LA.1943-4170.0000355.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265996
    description abstractThe inevitable nature of claims and disputes in construction projects necessitates effective administration and resolution mechanisms. To this end, mechanisms stipulated in the standard contract forms in use are frequently streamlined to address issues pertaining to their application in practice and to become more aligned with the laws prevailing over their use. The case of the widely accepted standard conditions by the International Federation of Consulting Engineers (FIDIC) is not an exception, with the latest release having taken place at the end of 2017. In this overdue release, major changes have been introduced that appear to be driven by the need to promote dispute avoidance and ensure a regulated progression of claims along the claim and dispute timeline. As such, the objective of the work presented in this paper was twofold: (1) to conduct a thorough review and detailed analyses of the newly released conditions pertaining to the initiation of claims and their progression into disputes, and (2) to provide a systematic comparison of these conditions with those of the previous release made in 1999. The findings revealed significant changes that involve (1) new roles required of both the engineer and the employer (owner) in relation to assessing the validity of the claim notice and the satisfaction of the claim contractual basis requirements, (2) an augmented consultative role for the engineer in reaching agreement before resorting to the issuance of a determination, (3) giving the engineer’s already binding determination the possibility of becoming final, and (4) regulating the timing of the possible referral of the matter in dispute to adjudication. Finally, the newly inherent dispute avoidance approach has been highlighted through the offered comparative time-bar analysis.
    publisherASCE
    titlePivotal New Roles and Changes Introduced by the 2017 FIDIC’s Claim and Dispute Resolution Mechanism
    typeJournal Paper
    journal volume12
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000355
    page04519049
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian