YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Hydraulic Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Hydraulic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Prototype-Scale Investigation of Spillway Cavitation Damage and Numerical Modeling of Mitigation Options

    Source: Journal of Hydraulic Engineering:;2020:;Volume ( 146 ):;issue: 002
    Author:
    Faizal Yusuf
    ,
    Zoran Micovic
    DOI: 10.1061/(ASCE)HY.1943-7900.0001671
    Publisher: ASCE
    Abstract: This paper documents a prototype-scale investigation of cavitation damage to a newly resurfaced spillway being used operationally during phased construction work to replace all piers and radial gates. Initial concrete damage on the right abutment spillway steps occurred in December 2015 as a result of over 300 h of continuous spilling from a new spillway gate. No cavitation damage had been observed on the original spillway constructed in the 1930s. Factors that contributed to the cavitation damage for this spillway are reviewed, including the duration of continuous spill and the increased cavitation potential of both a smooth concrete surface compared to one that is uniformly rough and sharp-edged steps compared to steps with rounded edges. Continued spilling through 2016 exacerbated concrete damage to the spillway steps leading to an experimental interim measure of constructing a tetrahedron concrete wedge to reduce the magnitude of flow separation and mitigate material loss in the location of greatest damage. Although damage to the steps continued to progress with ongoing spilling, the concrete wedge was successful in reducing the extent of damage at that location. A numerical model was calibrated by comparing simulated pressures to observed concrete damage allowing a long-term cavitation mitigation option to be designed with increased minimum pressures of approximately 50% and greater at the spillway steps compared to the 2015 as-built geometry.
    • Download: (5.309Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Prototype-Scale Investigation of Spillway Cavitation Damage and Numerical Modeling of Mitigation Options

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4265874
    Collections
    • Journal of Hydraulic Engineering

    Show full item record

    contributor authorFaizal Yusuf
    contributor authorZoran Micovic
    date accessioned2022-01-30T19:43:53Z
    date available2022-01-30T19:43:53Z
    date issued2020
    identifier other%28ASCE%29HY.1943-7900.0001671.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265874
    description abstractThis paper documents a prototype-scale investigation of cavitation damage to a newly resurfaced spillway being used operationally during phased construction work to replace all piers and radial gates. Initial concrete damage on the right abutment spillway steps occurred in December 2015 as a result of over 300 h of continuous spilling from a new spillway gate. No cavitation damage had been observed on the original spillway constructed in the 1930s. Factors that contributed to the cavitation damage for this spillway are reviewed, including the duration of continuous spill and the increased cavitation potential of both a smooth concrete surface compared to one that is uniformly rough and sharp-edged steps compared to steps with rounded edges. Continued spilling through 2016 exacerbated concrete damage to the spillway steps leading to an experimental interim measure of constructing a tetrahedron concrete wedge to reduce the magnitude of flow separation and mitigate material loss in the location of greatest damage. Although damage to the steps continued to progress with ongoing spilling, the concrete wedge was successful in reducing the extent of damage at that location. A numerical model was calibrated by comparing simulated pressures to observed concrete damage allowing a long-term cavitation mitigation option to be designed with increased minimum pressures of approximately 50% and greater at the spillway steps compared to the 2015 as-built geometry.
    publisherASCE
    titlePrototype-Scale Investigation of Spillway Cavitation Damage and Numerical Modeling of Mitigation Options
    typeJournal Paper
    journal volume146
    journal issue2
    journal titleJournal of Hydraulic Engineering
    identifier doi10.1061/(ASCE)HY.1943-7900.0001671
    page04019057
    treeJournal of Hydraulic Engineering:;2020:;Volume ( 146 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian