YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 005
    Author:
    Michał Tomczak
    ,
    Piotr Jaśkowski
    DOI: 10.1061/(ASCE)CO.1943-7862.0001824
    Publisher: ASCE
    Abstract: A significant number of construction projects involve repetitive processes. Planning them occurs to be a complex task. Network methods traditionally applied to construction scheduling prove inefficient in the case of repetitive construction projects (RCPs) due to the increased number of relationships among processes, locations (units), and resources. Frequently, the aim of scheduling RCPs is making the full use of the resources’ capacity, thereby ensuring continuity of the crews’ work. To achieve this, the planner typically allows discontinuity of some secondary processes to shift resources to the key processes, allowing optional modes of process delivery and introducing soft precedence relations between processes. This paper presents a new way of increasing the continuity of work of a general contractor’s crews in RCPs by employing subcontractors’ crews. A deterministic mathematical model of the mixed-integer linear problem of a repetitive (nonlinear) project was formulated to find a schedule that minimizes the downtime of the general contractor’s crews under constraints of a maximum acceptable total project duration and a maximum acceptable cost of the works commissioned to subcontractors; the model accounts for the limited availability of crews. Application of the model is illustrated by an example.
    • Download: (995.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4265193
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMichał Tomczak
    contributor authorPiotr Jaśkowski
    date accessioned2022-01-30T19:23:04Z
    date available2022-01-30T19:23:04Z
    date issued2020
    identifier other%28ASCE%29CO.1943-7862.0001824.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265193
    description abstractA significant number of construction projects involve repetitive processes. Planning them occurs to be a complex task. Network methods traditionally applied to construction scheduling prove inefficient in the case of repetitive construction projects (RCPs) due to the increased number of relationships among processes, locations (units), and resources. Frequently, the aim of scheduling RCPs is making the full use of the resources’ capacity, thereby ensuring continuity of the crews’ work. To achieve this, the planner typically allows discontinuity of some secondary processes to shift resources to the key processes, allowing optional modes of process delivery and introducing soft precedence relations between processes. This paper presents a new way of increasing the continuity of work of a general contractor’s crews in RCPs by employing subcontractors’ crews. A deterministic mathematical model of the mixed-integer linear problem of a repetitive (nonlinear) project was formulated to find a schedule that minimizes the downtime of the general contractor’s crews under constraints of a maximum acceptable total project duration and a maximum acceptable cost of the works commissioned to subcontractors; the model accounts for the limited availability of crews. Application of the model is illustrated by an example.
    publisherASCE
    titleNew Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects
    typeJournal Paper
    journal volume146
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001824
    page04020043
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian