YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Strengthening Prestressed Concrete Box Girder Bridge by Upgrading Structural System

    Source: Journal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 001
    Author:
    Song Yifan
    ,
    Hu Wenliang
    ,
    Yuan Yangguang
    ,
    Ren Shipu
    DOI: 10.1061/(ASCE)CF.1943-5509.0001377
    Publisher: ASCE
    Abstract: The Yellow River Dongming Highway Bridge (YRDMHB) is a prestressed concrete rigid frame-continuous girder bridge located in Shandong Province, China, constructed in 1993. After 10 years of operation, a deflection of 150 mm was observed at the midspan of the bridge, and this deflection had a considerable negative influence on the serviceability of the structure. This research presents a strengthening process for the YRDMHB using stay cables to mitigate the midspan deflection. Specifically, the girder structure is modified to a pseudo-cable–stayed bridge by adding an extension system, which consists of two pairs of stay cables, towers, and joist-bracket structures. Furthermore, steel joist-bracket structures are added below the four sections of the main girder to anchor the cables. The load of the girder is shared by the cables and transferred to the new main towers, changing the internal force and line shape of the girder. Through this strengthening method, the original girder structure is upgraded to a cable-girder cooperative work system. The strengthening work includes theoretical analysis, laboratory tests, plan implementation, and field load tests. First, the strengthening scheme using stay cables is illustrated and laboratory static load tests are conducted to verify the applicability of the proposed plan. Second, the strengthening scheme is implemented and the key mechanical and geometrical parameters are monitored. Third, to examine the effectiveness of the strengthening project, field load tests are conducted. The results show that the static and dynamic performance of different span box girders is better than that before strengthening. Through the strengthening process described in this paper, the stiffness of the structure is improved by strengthening.
    • Download: (13.99Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Strengthening Prestressed Concrete Box Girder Bridge by Upgrading Structural System

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4264900
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorSong Yifan
    contributor authorHu Wenliang
    contributor authorYuan Yangguang
    contributor authorRen Shipu
    date accessioned2022-01-30T19:13:53Z
    date available2022-01-30T19:13:53Z
    date issued2020
    identifier other%28ASCE%29CF.1943-5509.0001377.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4264900
    description abstractThe Yellow River Dongming Highway Bridge (YRDMHB) is a prestressed concrete rigid frame-continuous girder bridge located in Shandong Province, China, constructed in 1993. After 10 years of operation, a deflection of 150 mm was observed at the midspan of the bridge, and this deflection had a considerable negative influence on the serviceability of the structure. This research presents a strengthening process for the YRDMHB using stay cables to mitigate the midspan deflection. Specifically, the girder structure is modified to a pseudo-cable–stayed bridge by adding an extension system, which consists of two pairs of stay cables, towers, and joist-bracket structures. Furthermore, steel joist-bracket structures are added below the four sections of the main girder to anchor the cables. The load of the girder is shared by the cables and transferred to the new main towers, changing the internal force and line shape of the girder. Through this strengthening method, the original girder structure is upgraded to a cable-girder cooperative work system. The strengthening work includes theoretical analysis, laboratory tests, plan implementation, and field load tests. First, the strengthening scheme using stay cables is illustrated and laboratory static load tests are conducted to verify the applicability of the proposed plan. Second, the strengthening scheme is implemented and the key mechanical and geometrical parameters are monitored. Third, to examine the effectiveness of the strengthening project, field load tests are conducted. The results show that the static and dynamic performance of different span box girders is better than that before strengthening. Through the strengthening process described in this paper, the stiffness of the structure is improved by strengthening.
    publisherASCE
    titleStrengthening Prestressed Concrete Box Girder Bridge by Upgrading Structural System
    typeJournal Paper
    journal volume34
    journal issue1
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001377
    page04019103
    treeJournal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian