YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Administration Impairments Resulting from Imbalanced Contract Conditions: Owner Payment Default

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    Author:
    Mohamed-Asem U. Abdul-Malak
    ,
    Hilmi F. Hanano
    ,
    Hiba M. Turman
    DOI: 10.1061/(ASCE)LA.1943-4170.0000321
    Publisher: American Society of Civil Engineers
    Abstract: It is not uncommon that construction contract conditions are found to be drafted in such a way that protects the interest of project owners, and that contractors fail to detect—or succeed in favorably negotiating—such conditions before entering into these contracts. Such imbalanced contracts are likely to generate major difficulties for all participants involved in their administration during the course of construction. This paper presents a thorough analysis of a claim case dealing with the repercussions of an owner’s successive payment defaults under a contract—characterized by imbalanced contract conditions—for the construction of a 300-unit residential towers project. The adopted methodology involved (1) benchmarking the relevant contract terms governing the arisen dispute to those of an international standard form of conditions widely used in the project locality; (2) examining the full series of actions and correspondence by, or on behalf of, the parties to the contract along the dispute timeline that extends into the arbitration proceedings period; and (3) highlighting the steps that could have been taken by the contractor in order to better preserve their interests despite the prevailing biased contract conditions. The findings clearly reveal that timely yet tactical contract administration actions, which could have been used for dealing with the mandated unbalanced conditions, can help improve the standing of the contractor’s raised claim and its chances for a more successful resolution. The paper concludes with an analysis of proposed preventive strategies and windows of opportunities available to contractors for questioning and negotiating such detrimental conditions.
    • Download: (3.170Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Administration Impairments Resulting from Imbalanced Contract Conditions: Owner Payment Default

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4260643
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorMohamed-Asem U. Abdul-Malak
    contributor authorHilmi F. Hanano
    contributor authorHiba M. Turman
    date accessioned2019-09-18T10:43:00Z
    date available2019-09-18T10:43:00Z
    date issued2019
    identifier other%28ASCE%29LA.1943-4170.0000321.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4260643
    description abstractIt is not uncommon that construction contract conditions are found to be drafted in such a way that protects the interest of project owners, and that contractors fail to detect—or succeed in favorably negotiating—such conditions before entering into these contracts. Such imbalanced contracts are likely to generate major difficulties for all participants involved in their administration during the course of construction. This paper presents a thorough analysis of a claim case dealing with the repercussions of an owner’s successive payment defaults under a contract—characterized by imbalanced contract conditions—for the construction of a 300-unit residential towers project. The adopted methodology involved (1) benchmarking the relevant contract terms governing the arisen dispute to those of an international standard form of conditions widely used in the project locality; (2) examining the full series of actions and correspondence by, or on behalf of, the parties to the contract along the dispute timeline that extends into the arbitration proceedings period; and (3) highlighting the steps that could have been taken by the contractor in order to better preserve their interests despite the prevailing biased contract conditions. The findings clearly reveal that timely yet tactical contract administration actions, which could have been used for dealing with the mandated unbalanced conditions, can help improve the standing of the contractor’s raised claim and its chances for a more successful resolution. The paper concludes with an analysis of proposed preventive strategies and windows of opportunities available to contractors for questioning and negotiating such detrimental conditions.
    publisherAmerican Society of Civil Engineers
    titleAdministration Impairments Resulting from Imbalanced Contract Conditions: Owner Payment Default
    typeJournal Paper
    journal volume11
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000321
    page05019003
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian