YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Sequencing and Operational Variations of Standard Claim and Dispute Resolution Mechanisms

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 003
    Author:
    Mohammad Barakat
    ,
    Mohamed-Asem Abdul-Malak
    ,
    Hiam Khoury
    DOI: 10.1061/(ASCE)LA.1943-4170.0000304
    Publisher: American Society of Civil Engineers
    Abstract: Construction contract conditions play a critical role in the administration and resolution of claims and disputes. In practice, such relevant conditions, including those of the widely adopted standard conditions, are found to offer a variety of multistep mechanisms that can be prompted for that purpose. The objective of this paper is to perform a comparative analysis of the various claim and dispute administration and resolution steps stipulated under these standard conditions. The analysis is specifically concerned with the investigation of (1) the steps stipulated under each set, (2) the sequence with which these steps can be triggered, and (3) the resulting spectrum of the steps’ operational variations that exist across all the examined mechanisms. The methodology involved examining the claim and dispute resolution provisions, developing the claim and dispute progression timelines, extracting the detailed factors governing the operations of each stage within the discussed timelines, and designing matrices that illustrate the operational variations at each stage. The work findings revealed the full continuum of the multiple steps—and their sequence—that contributes to the construction of an all-encompassing mechanism. Such a holistic mechanism, along with the deduced differing operational variations for each of its steps, can guide project owners in custom tailoring the preferred claim and disputes tracking and resolution mechanisms.
    • Download: (1.312Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Sequencing and Operational Variations of Standard Claim and Dispute Resolution Mechanisms

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4260627
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorMohammad Barakat
    contributor authorMohamed-Asem Abdul-Malak
    contributor authorHiam Khoury
    date accessioned2019-09-18T10:42:56Z
    date available2019-09-18T10:42:56Z
    date issued2019
    identifier other%28ASCE%29LA.1943-4170.0000304.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4260627
    description abstractConstruction contract conditions play a critical role in the administration and resolution of claims and disputes. In practice, such relevant conditions, including those of the widely adopted standard conditions, are found to offer a variety of multistep mechanisms that can be prompted for that purpose. The objective of this paper is to perform a comparative analysis of the various claim and dispute administration and resolution steps stipulated under these standard conditions. The analysis is specifically concerned with the investigation of (1) the steps stipulated under each set, (2) the sequence with which these steps can be triggered, and (3) the resulting spectrum of the steps’ operational variations that exist across all the examined mechanisms. The methodology involved examining the claim and dispute resolution provisions, developing the claim and dispute progression timelines, extracting the detailed factors governing the operations of each stage within the discussed timelines, and designing matrices that illustrate the operational variations at each stage. The work findings revealed the full continuum of the multiple steps—and their sequence—that contributes to the construction of an all-encompassing mechanism. Such a holistic mechanism, along with the deduced differing operational variations for each of its steps, can guide project owners in custom tailoring the preferred claim and disputes tracking and resolution mechanisms.
    publisherAmerican Society of Civil Engineers
    titleSequencing and Operational Variations of Standard Claim and Dispute Resolution Mechanisms
    typeJournal Paper
    journal volume11
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000304
    page04519012
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian