YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Change Orders on Road Maintenance Contracts: Causes and Preventive Measures

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 003
    Author:
    Kabindra K. Shrestha
    ,
    Pramen P. Shrestha
    DOI: 10.1061/(ASCE)LA.1943-4170.0000299
    Publisher: American Society of Civil Engineers
    Abstract: A Delphi study was conducted with maintenance engineers of state DOTs in the United States to identify the causes and preventive measures of change orders (COs) in road maintenance projects. Five road maintenance activities that are frequently conducted were selected in order to identify the causes and preventive measures of COs; these were chip seal, striping, asphalt overlay, slope repairs, and debris removal. The intraclass correlation coefficient (ICC) values, which showed the overall agreement of the respondents as to the causes and preventive measures of COs, were determined. It was found that the respondents had excellent agreement with the causes of change orders for all activities (ICC>0.75), except for the causes of change orders for chip seal. This study found that the main causes of COs on maintenance projects were due to incorrect work scope, errors in the estimate, changes in the original plan, and changes in specifications for materials, as well as failure to verify the work site conditions before signing a contract. In addition, the respondents showed a high level of agreement with the preventative measures of COs for all types of maintenance activities (ICC>0.82). Some important preventive measures to reduce COs that were identified included reviewing the specifications before bid solicitation, preparing accurate estimates, reviewing design drawings, measuring the work done with the contractor, and performing a thorough geotechnical site investigation before designing. Identifying the causes and preventive measures of COs in road maintenance projects can provide valuable information for maintenance engineers to help them plan maintenance work so that a significant amount of COs can be reduced in these types of projects. This paper will also provide a summary of causes and measures to minimize COs in a format that can be easily used by state DOT engineers in their road maintenance contracts.
    • Download: (371.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Change Orders on Road Maintenance Contracts: Causes and Preventive Measures

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4260620
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorKabindra K. Shrestha
    contributor authorPramen P. Shrestha
    date accessioned2019-09-18T10:42:54Z
    date available2019-09-18T10:42:54Z
    date issued2019
    identifier other%28ASCE%29LA.1943-4170.0000299.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4260620
    description abstractA Delphi study was conducted with maintenance engineers of state DOTs in the United States to identify the causes and preventive measures of change orders (COs) in road maintenance projects. Five road maintenance activities that are frequently conducted were selected in order to identify the causes and preventive measures of COs; these were chip seal, striping, asphalt overlay, slope repairs, and debris removal. The intraclass correlation coefficient (ICC) values, which showed the overall agreement of the respondents as to the causes and preventive measures of COs, were determined. It was found that the respondents had excellent agreement with the causes of change orders for all activities (ICC>0.75), except for the causes of change orders for chip seal. This study found that the main causes of COs on maintenance projects were due to incorrect work scope, errors in the estimate, changes in the original plan, and changes in specifications for materials, as well as failure to verify the work site conditions before signing a contract. In addition, the respondents showed a high level of agreement with the preventative measures of COs for all types of maintenance activities (ICC>0.82). Some important preventive measures to reduce COs that were identified included reviewing the specifications before bid solicitation, preparing accurate estimates, reviewing design drawings, measuring the work done with the contractor, and performing a thorough geotechnical site investigation before designing. Identifying the causes and preventive measures of COs in road maintenance projects can provide valuable information for maintenance engineers to help them plan maintenance work so that a significant amount of COs can be reduced in these types of projects. This paper will also provide a summary of causes and measures to minimize COs in a format that can be easily used by state DOT engineers in their road maintenance contracts.
    publisherAmerican Society of Civil Engineers
    titleChange Orders on Road Maintenance Contracts: Causes and Preventive Measures
    typeJournal Paper
    journal volume11
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000299
    page04519009
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian