YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Classification of Modular Building Construction Projects Based on Schedule-Driven Approach

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 005
    Author:
    Jeonghoon Lee
    ,
    Moonseo Park
    ,
    Hyun-Soo Lee
    ,
    Hosang Hyun
    DOI: 10.1061/(ASCE)CO.1943-7862.0001656
    Publisher: American Society of Civil Engineers
    Abstract: Modular construction projects involve concurrent manufacturing production and construction processes for constructing the main structure and the foundation, on-site installation, and finishing work. Using process-driven project scheduling, it is difficult to analyze how different issues affect the overall project schedule and determine alternative solutions based on what-if scenario analysis (WISA). This paper proposes the classification of modular building construction projects as manufacturing driven, on-site driven, or a combination to improve scheduling strategies based on a schedule-driven approach. The scheduling focus is shifted from the working precedence (manufacturing → transportation → installation) to project scales and constraint changes. A discrete-event simulation model is developed for modular construction projects, and WISA is performed in actual modular construction projects. It is noted that compared with the existing WISA method that obtains construction schedule probabilities for specific tasks sequentially and independently, scheduling-based project classification and reflection of expected events are more effective in examining and determining scheduling alternatives. The proposed scheduling strategies and simulation model can enable project managers to assess several alternative scheduling solutions based on project characteristics.
    • Download: (1.577Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Classification of Modular Building Construction Projects Based on Schedule-Driven Approach

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4260024
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJeonghoon Lee
    contributor authorMoonseo Park
    contributor authorHyun-Soo Lee
    contributor authorHosang Hyun
    date accessioned2019-09-18T10:40:04Z
    date available2019-09-18T10:40:04Z
    date issued2019
    identifier other%28ASCE%29CO.1943-7862.0001656.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4260024
    description abstractModular construction projects involve concurrent manufacturing production and construction processes for constructing the main structure and the foundation, on-site installation, and finishing work. Using process-driven project scheduling, it is difficult to analyze how different issues affect the overall project schedule and determine alternative solutions based on what-if scenario analysis (WISA). This paper proposes the classification of modular building construction projects as manufacturing driven, on-site driven, or a combination to improve scheduling strategies based on a schedule-driven approach. The scheduling focus is shifted from the working precedence (manufacturing → transportation → installation) to project scales and constraint changes. A discrete-event simulation model is developed for modular construction projects, and WISA is performed in actual modular construction projects. It is noted that compared with the existing WISA method that obtains construction schedule probabilities for specific tasks sequentially and independently, scheduling-based project classification and reflection of expected events are more effective in examining and determining scheduling alternatives. The proposed scheduling strategies and simulation model can enable project managers to assess several alternative scheduling solutions based on project characteristics.
    publisherAmerican Society of Civil Engineers
    titleClassification of Modular Building Construction Projects Based on Schedule-Driven Approach
    typeJournal Paper
    journal volume145
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001656
    page04019031
    treeJournal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian