YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Approximate Fundamental Period for Seismic Design of Steel Buildings Assigned to High Risk Categories

    Source: Practice Periodical on Structural Design and Construction:;2019:;Volume ( 024 ):;issue: 004
    Author:
    John L. Harris
    ,
    Jeffrey L. Michel
    DOI: 10.1061/(ASCE)SC.1943-5576.0000444
    Publisher: American Society of Civil Engineers
    Abstract: Seismic analysis provisions in ASCE/SEI 7-16 (ASCE. 2016. Minimum design loads and associated criteria for buildings and other structures. ASCE/SEI 7-16. Reston, VA: ASCE.) use an approximate fundamental period as a proxy for, or to limit, the fundamental period of a building for design. This design period does not vary as a function of the risk category assigned to a building. Fifty-four steel buildings (4-, 8-, and 16-story) with three different seismic force-resisting systems (moment frame, concentrically and eccentrically braced frame) are designed for a region of high seismicity for Risk Category II, III, and IV. The results indicate that the analytical fundamental period is affected when an importance factor greater than 1.0 is used for design, as is required for assigned higher risk categories. Moreover, the database of measured vibration data taken from steel buildings used to establish the empirical formula adopted by ASCE/SEI 7-16 to compute the approximate fundamental period did not include buildings designed with an importance factor. Consequently, if the performance objective is to achieve uniform risk within a category, then the design period should vary as a function of the risk category. In the absence of a lower-bound empirical formulation for the approximate period using a database of vibration data from buildings categorized by risk category, a straightforward modification to the current formulation is proposed that incorporates the change in system strength.
    • Download: (1.747Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Approximate Fundamental Period for Seismic Design of Steel Buildings Assigned to High Risk Categories

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4259572
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorJohn L. Harris
    contributor authorJeffrey L. Michel
    date accessioned2019-09-18T10:37:47Z
    date available2019-09-18T10:37:47Z
    date issued2019
    identifier other%28ASCE%29SC.1943-5576.0000444.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4259572
    description abstractSeismic analysis provisions in ASCE/SEI 7-16 (ASCE. 2016. Minimum design loads and associated criteria for buildings and other structures. ASCE/SEI 7-16. Reston, VA: ASCE.) use an approximate fundamental period as a proxy for, or to limit, the fundamental period of a building for design. This design period does not vary as a function of the risk category assigned to a building. Fifty-four steel buildings (4-, 8-, and 16-story) with three different seismic force-resisting systems (moment frame, concentrically and eccentrically braced frame) are designed for a region of high seismicity for Risk Category II, III, and IV. The results indicate that the analytical fundamental period is affected when an importance factor greater than 1.0 is used for design, as is required for assigned higher risk categories. Moreover, the database of measured vibration data taken from steel buildings used to establish the empirical formula adopted by ASCE/SEI 7-16 to compute the approximate fundamental period did not include buildings designed with an importance factor. Consequently, if the performance objective is to achieve uniform risk within a category, then the design period should vary as a function of the risk category. In the absence of a lower-bound empirical formulation for the approximate period using a database of vibration data from buildings categorized by risk category, a straightforward modification to the current formulation is proposed that incorporates the change in system strength.
    publisherAmerican Society of Civil Engineers
    titleApproximate Fundamental Period for Seismic Design of Steel Buildings Assigned to High Risk Categories
    typeJournal Paper
    journal volume24
    journal issue4
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)SC.1943-5576.0000444
    page04019023
    treePractice Periodical on Structural Design and Construction:;2019:;Volume ( 024 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian