YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Estimating Recoverable Performance Degradation Rates and Optimizing Maintenance Scheduling

    Source: Journal of Engineering for Gas Turbines and Power:;2019:;volume( 141 ):;issue: 001::page 11032
    Author:
    Allen, Cody W.
    ,
    Holcomb, Chad M.
    ,
    de Oliveira, Maurício
    DOI: 10.1115/1.4041004
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Many of the components on a gas turbine are subject to fouling and degradation over time due to debris buildup. For example, axial compressors are susceptible to degradation as a result of debris buildup on compressor blades. Similarly, air-cooled lube oil heat exchangers incur degradation as a result of debris buildup in the cooling air passageways. In this paper, we develop a method for estimating the degradation rate of a given gas turbine component that experiences recoverable degradation due to normal operation over time. We then establish an economic maintenance scheduling model, which utilizes the derived rate and user input economic factors to provide a locally optimal maintenance schedule with minimized operator costs. The rate estimation method makes use of statistical methods combined with historical data to give an algorithm with which a performance loss rate can be extracted from noisy data measurements. The economic maintenance schedule is then derived by minimizing the cost model in user specified intervals and the final schedule results as a combination of the locally optimized schedules. The goal of the combination of algorithms is to maximize component output and efficiency, while minimizing maintenance costs. The rate estimation method is validated by simulation where the underlying noisy data measurements come from a known probability distribution. Then, an example schedule optimization is provided to validate the economic optimization model and show the efficacy of the combined methods.
    • Download: (2.266Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Estimating Recoverable Performance Degradation Rates and Optimizing Maintenance Scheduling

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4256357
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorAllen, Cody W.
    contributor authorHolcomb, Chad M.
    contributor authorde Oliveira, Maurício
    date accessioned2019-03-17T10:53:15Z
    date available2019-03-17T10:53:15Z
    date copyright11/14/2018 12:00:00 AM
    date issued2019
    identifier issn0742-4795
    identifier othergtp_141_01_011032.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4256357
    description abstractMany of the components on a gas turbine are subject to fouling and degradation over time due to debris buildup. For example, axial compressors are susceptible to degradation as a result of debris buildup on compressor blades. Similarly, air-cooled lube oil heat exchangers incur degradation as a result of debris buildup in the cooling air passageways. In this paper, we develop a method for estimating the degradation rate of a given gas turbine component that experiences recoverable degradation due to normal operation over time. We then establish an economic maintenance scheduling model, which utilizes the derived rate and user input economic factors to provide a locally optimal maintenance schedule with minimized operator costs. The rate estimation method makes use of statistical methods combined with historical data to give an algorithm with which a performance loss rate can be extracted from noisy data measurements. The economic maintenance schedule is then derived by minimizing the cost model in user specified intervals and the final schedule results as a combination of the locally optimized schedules. The goal of the combination of algorithms is to maximize component output and efficiency, while minimizing maintenance costs. The rate estimation method is validated by simulation where the underlying noisy data measurements come from a known probability distribution. Then, an example schedule optimization is provided to validate the economic optimization model and show the efficacy of the combined methods.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleEstimating Recoverable Performance Degradation Rates and Optimizing Maintenance Scheduling
    typeJournal Paper
    journal volume141
    journal issue1
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.4041004
    journal fristpage11032
    journal lastpage011032-10
    treeJournal of Engineering for Gas Turbines and Power:;2019:;volume( 141 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian